Permit Information
Permit NumberELE18-00221
StatusFinaled
Name KC ENTERPRISES
Site Address 4614 N PIERCE PARK LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Alteration or Repair: Meter was shut off by IPCO for unknown reasons. Looked at service, tree had grown in front of combo meter service, I could not get panel front open to look at service. Tree has since been cut down to meet working clearance. Would like to meet inspector o
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/20/201812/21/201812/20/2018APASS
DetailsMark Moncarr
This was a service that the underground wiring had been destroyed by tree roots. Service was redone and inspected prior to Idaho Power energizing, just need to get final on it. Thanks Kurt Carlson I do not know if trailer is occupied or being lived in, may have to knock on door. Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok final. Looked at on 1/18/18. This is to close out permit.
Permanent Service1/18/20181/19/20181/19/2018APASS
DetailsMark Moncarr
Load side conduit and feeder, from the service pedestal has been replaced. Mark Moncarr, Boise City Electrical inspector verified depth and gave ok to cover underground conduits. Conductors have been installed, from service pedestal to the trailer panel, 2 hots, 1- insulated neutral and 1- #4 copper ground. Bonding is done at the service pedestal . Phone #: ###-#### Inspection requested via web by Kurt Carlson p/s u/g rec ok
Permanent Service1/17/20181/17/20181/17/2018PFAIL
DetailsMark Moncarr
This is a trailer home, located at space #3. Power was turned off by IPCO for unknown reasons, maybe non payment. Tree had grown in front of panel making it unable to open panel door and blocking meter. Tree has since been removed correcting clearance problems. I would like to meet the inspector on site and go through any non code compliance problems and get the service permitted for reenergizing by IPCO Phone #: ###-#### Inspection requested via web by Kurt Carlson 1 phase conductor load side came in contact with top of rigid pipe inside pedistal. No bushing was used for conduit, so it eventually wore through insulation.