Final | 8/2/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Rock A. Hudson
|
|
|
Contact for Entry into building: Rex Neilson ###-#### Phone #: ###-#### Inspection requested via web by Harvey Reyna Kitchen area to be permitted and finished in future. Final ok
|
Electrical Rough-In | 5/25/2018 | 5/29/2018 | 5/29/2018 | A | PASS |
Eric Story
|
|
|
Ceiling in kitchen area. Phone #: ###-#### Inspection requested via web by Harvey Reyna Ceiling only in kitchen ok to cover suspended ceilings tiles
|
Electrical Rough-In | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | PASS |
Rock A. Hudson
|
|
|
soffit inspection Phone #: ###-#### Inspection requested via web by Harvey Reyna Access required to soffit due to junction boxes above. Shall provide access to boxes at each end that face out for face of soffit. Front soffit only rough in ok cover
|
Conference | 4/12/2018 | 4/12/2018 | 4/12/2018 | P | DONE |
Rock A. Hudson
|
|
|
Contact: Dave Phone #: ###-#### Inspection requested via web by Harvey Reyna Discussed location of panels, what wiring ok to remain, show window receptacles, inspections needed. 240.24(C)- Panel location in kitchen area shall have adequate distance from sink for a barrier providing separation. 240.24(E)- Panel located in bathroom may remain if enclosed with walls and a doorway creating separation. Also noted in BCC 4-05-31(A). 210.62- Show window receptacles shall be located with in 18" of top of window and spacing corrected. 400.12- Asked if existing light fixtures could remain. Flexible cords shall not be used as substitute for structural wiring. Lighting shall comply with IECC for total wattage allowed. Asked if could request a inspection for certain areas to be done in phases to help job move forward quicker. OK to request couple extra inspections.
|