Rough-In Permanent Service | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | CANC |
Rock A. Hudson
|
|
|
Call first please Inspect trench for feeder Phone #: ###-#### Inspection requested via web by Eddy Udry Needed underground rough in only.
|
Electrical Rough-In | 10/16/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Rock A. Hudson
|
|
|
Call first please Inspect trench for feeder Phone #: ###-#### Inspection requested via web by Eddy Udry Discussed 250.32(B) equipment ground and grounding electrodes required at seperate house structure. Back window has all operable panes with no wall space to serve kitchen counter space, area to be treated as an island. Full length cabinets planned to most walls in living space shall provide floor or toe kick receptacles to serve wall space. Underground from garage to house rough in ok cover
|