Electrical Rough-In | 6/30/2020 | 7/1/2020 | 7/1/2020 | A | PASS |
Mark Moncarr
|
|
|
screened // Lloyd Phone #: ###-#### Ok cover closet in basement.
|
Electrical Rough-In | 1/18/2019 | 1/18/2019 | 1/18/2019 | P | PASS |
Mark Moncarr
|
|
|
Lloyd ###-#### Homeowner. Ok cover ceiling, and all other walls except where work is being done. 10/3 junction point to left of utility door needs open for inspection.
|
Conference | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | DONE |
Mark Moncarr
|
|
|
Lloyd Phone #: ###-#### Discussed required outlets needed after closet is built. 10/3 UF spiced in wall left of door going into utility. Needs to be open upon RI inspection to verify correct junction or removal of wire. Also discussed load calc since adding 30a mini split circuit. Panel is full.
|