Final | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Mark Moncarr
|
|
|
Please call Brad with any questions Phone #: ###-#### Inspection requested via web by BRAD BAKER Ok final.
|
Electrical Rough-In | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | PASS |
Tom Saunders
|
|
|
garage lid...ok to cover
|
Electrical Rough-In | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Tom Saunders
|
|
|
I walked the job and help make the corrections we should be ready for cover thanks Brad Phone #: ###-#### Inspection requested via web by Brad Baker.... rough in upstairs only garage not approved for cover...general on job knows and will be contacting electrical contractor
|
Electrical Rough-In | 1/31/2019 | 2/1/2019 | 2/1/2019 | P | FAIL |
Tom Saunders
|
|
|
Should all be open Phone #: ###-#### Inspection requested via web by Brad Baker... 1..NM cable ran parallel to framing members shall keep 1 1/4" distance from nearest edge of framing member 300.4(D) 2..where NM cable enters a junction box or device box a minimum of a 1/4 " of sheathing shall be in box- MULTIPLE LOCATIONS..314.17(C) 3..NM cable shall be secured/supported every 4 1/2 ft and within 12" of every cable entry into enclosure-334.30, within 8" of plastic boxes 314.17(C) 4..home runs need stapled within 12" of panel
|