Final | 10/17/2019 | 10/18/2019 | 10/18/2019 | A | PASS |
Mark Moncarr
|
|
|
Brett is the contact. Phone #: ###-#### Inspection requested via web by Deb Ipsen Ok final. Fuses for roof top unit changed out, GFI protection provided at areas listed.
|
Final | 9/25/2019 | 9/26/2019 | 9/26/2019 | P | PART |
Rock A. Hudson
|
|
|
Electrical final, Brett is the contact. Phone #: ###-#### Inspection requested via web by Deb Ipsen 210.8(B)- All 120 volt receptacles located in kitchen area shall have GFCI protection. Left of serving window and right of ovens on 1/2 wall. 440.6- Fuse for small roof top unit min fuse over 30 amp, 30 amp fuses installed in disconnect. Contractor to correct by the time we do an AM fly by. Ovens from existing kitchen to be brought over at future time. Will need to verify these connections. TCO OK
|
Electrical Rough-In | 9/17/2019 | 9/19/2019 | 9/19/2019 | A | PASS |
Tom Saunders
|
|
|
Ceiling rough in... Shannon is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen...ok to cover
|
Electrical Rough-In | 9/17/2019 | 9/18/2019 | 9/17/2019 | A | CANC |
Tom Saunders
|
|
|
Ceiling rough. Shannon is the contact Phone #: ###-#### >> Inspection requested via web by Deb Ipsen Inspection cancelled from web by: Deb Ipsen
|
Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | CANC |
Tom Saunders
|
|
|
Hard lid ceiling rough in inspection. Brett Jenkins is the contact Phone #: ###-#### Inspection requested via web by Deb Ipsen...ok to cover...3 bathrooms
|
Electrical Rough-In | 7/1/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Eric Story
|
|
|
rough in walls. Shannon or Brett will be onsite Phone #: ###-#### Inspection requested via web by Deb Ipsen Walls only ok to cover
|
Electrical Rough-In | 7/1/2019 | 7/2/2019 | 7/1/2019 | A | CANC |
Tom Saunders
|
|
|
Rough in wall, Shannon or Brett will be on site Phone #: ###-#### >> Inspection requested via web by Deb Ipsen Inspection cancelled from web by: Deb Ipsen
|
Electrical Rough-In | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Tom Saunders
|
|
|
underground/ under slab inspection Brett is the contact ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates.. ok to cover
|
Permanent Service | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | CANC |
Tom Saunders
|
|
|
Permanent service inspection for module building. Phone #: ###-#### Inspection requested via web by Shawna Gates... wrong permit used...need seperate permit for permanent service pulled for modular building
|
Electrical Rough-In | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PASS |
Eric Story
|
|
|
Under ground inspection Contact person is Brett Jenkins Phone #: ###-#### Inspection requested via web by Shawna Gates U/G to out building for main power ok to cover
|
Electrical Rough-In | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Tom Saunders
|
|
|
UFER GROUND. TATE IS THE CONTACT: ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates... ok to cover
|