New: Full ground up construction of parking structure, including conduit, panels, gear, wiring, lights, lighting controls, receptacles and fire alarm
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Electrical Rough-In7/27/20207/28/20207/28/2020APASS
DetailsRock A. Hudson
Contact Justin for level 4 comm room walls. Phone #: ###-#### Inspection requested via web by Tom Betty Level 4 comm room walls rough in ok cover.
Electrical Rough-In7/24/20207/27/20207/27/2020ANH
DetailsRock A. Hudson
Rough In inspection for Level 4 Comm Room. Contact Justin.
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Called contact, no answer, must recall for when available.
Electrical Rough-In7/8/20207/8/20207/8/2020PPASS
DetailsJames Ady
Rough in inspection for levels GP and 2 Comm room walls. Phone #: ###-#### Inspection requested via web by John Mittleider Area listed walls only ok to cover
Electrical Rough-In7/6/20207/7/20207/7/2020APASS
DetailsJames Ady
Rough in inspection lighting and camera boxes and associated raceways for 6-4 concrete pour Phone #: ###-#### Inspection requested via web by John Mittleider Pour 6-4 ok to cover
Electrical Rough-In6/4/20206/5/20206/5/2020PPASS
DetailsJames Ady
Rough in inspection for boxes and raceways in slab 6-3. Phone #: ###-#### Inspection requested via web by John Mittleider 6 floor deck pour ok to cover Pics on file
Electrical Rough-In5/21/20205/21/20205/21/2020PPASS
DetailsRock A. Hudson
I rough in inspection for device boxes and raceways in ramps pour 6-2. Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
Electrical Rough-In5/12/20205/13/20205/13/2020PPASS
DetailsJames Ady
Rough in inspection for elevated deck pour of ramp 6-1. Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
Electrical Rough-In5/6/20205/6/20205/6/2020PPASS
DetailsJames Ady
Rough in inspection for lighting and camera device boxes and raceways in elevated deck pour 5-4. Phone #: ###-#### Inspection requested via web by John Mittleider Areas listed ok to cover
Electrical Rough-In4/22/20204/22/20204/22/2020PPASS
DetailsJames Ady
Rough in on pour 5-3 Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
Electrical Rough-In3/23/20203/23/20203/23/2020PPASS
DetailsRock A. Hudson
Inspect in slab boxes and raceways in ramp pour 5-2 Phone #: ###-#### Inspection requested via web by John Mittleider
Pour noted rough in ok cover
Electrical Rough-In3/18/20203/18/20203/18/2020PPASS
DetailsJames Ady
Inspect boxes and raceways in elevated deck pour 5-1. Phone #: ###-#### Inspection requested via web by John Mittleider Level 5 pour 1 ok to cover
Electrical Rough-In3/10/20203/10/20203/10/2020PPASS
DetailsJames Ady
Cover inspection for boxes and raceways in elevated deck pour L4-4. Phone #: ###-#### Inspection requested via web by John Mittleider Deck pour listed ok to cover
Electrical Rough-In2/24/20202/24/20202/24/2020PPASS
DetailsJames Ady
Rough in inspection for boxes and raceways in elevated deck pour 4-3 Phone #: ###-#### Inspection requested via web by John Mittleider area listed ok to cover
Electrical Rough-In2/13/20202/13/20202/13/2020PPASS
DetailsJames Ady
Rough inspection for in slab boxes and raceways in slab pour 4-2 Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
Electrical Rough-In2/4/20202/4/20202/4/2020PPASS
DetailsRock A. Hudson
Inspect electrical boxes and raceways in concrete ramp L4-1 Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
Electrical Rough-In1/27/20201/27/20201/27/2020PPASS
DetailsJames Ady
Inspect boxes and raceways in elevated deck pour L3-4. Phone #: ###-#### Inspection requested via web by John Mittleider areas listed ok to cover
Electrical Rough-In1/9/20201/9/20201/9/2020PPASS
DetailsRock A. Hudson
Rough inspection of boxes and raceways in elevated deck pour L3-3. Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
Electrical Rough-In12/26/201912/27/201912/27/2019PPASS
DetailsRock A. Hudson
Rough in inspection for in slab boxes and raceways in slab L3-2 Phone #: ###-#### Inspection requested via web by John Mittleider L3-2 ramp pour rough in ok cover
Electrical Rough-In12/9/201912/9/201912/9/2019PPASS
DetailsJames Ady
Inspect in slab boxes and raceways in slab L2-4 Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
Electrical Rough-In12/2/201912/2/201912/2/2019PPASS
DetailsJames Ady
Rough in in slab boxes and raceway for pour L2 -5. Call John ###-#### Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
Electrical Rough-In11/21/201911/21/201911/21/2019PPASS
DetailsJames Ady
In slab raceways and boxes for slab pour ramp 2A. Contact John 208- ###-#### Phone #: ###-#### Inspection requested via web by John Mittleider Level 2 Ramp ok to cover
Electrical Rough-In11/7/201911/8/201911/8/2019PPASS
DetailsJames Ady
Contact John for level 2 pour #3 in slab raceways. Phone #: ###-#### Inspection requested via web by Tom Betty Level 2 pour ok to cover
Electrical Rough-In11/7/201911/7/201911/7/2019PFAIL
DetailsRock A. Hudson
Contact John M. for level 2 pour #3 in slab raceways. Phone #: ###-#### Inspection requested via web by Tom Betty
300.18- Conduit runs shall be installed in complete runs.
352.30- PVC shall be supported at intervals not to exceed 3' for 1/2" thru 1" conduit.
Southeast and central east areas conduit installed and supported, about 1/2 of pour. Northeast and northern areas of pour conduit installation not complete at 2pm time of inspection. General contactor must give sufficient time to install raceways. Will recall for Friday AM, pour planned for 3:30pm.
Electrical Rough-In10/25/201910/25/201910/25/2019PPASS
DetailsJames Ady
Contact John for level 1 pour #5 rough in cover inspection. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed ok to covwer
Electrical Rough-In10/16/201910/16/201910/16/2019PPASS
DetailsJames Ady
Contact John for level 1 area 4 concrete pour rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Area 4 level 1 concrete pour ok to cover
Electrical Rough-In10/9/201910/10/201910/10/2019PPASS
DetailsJames Ady
Contact John for level 1 ramp #2 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 ramp 2 pour only ok to cover
Electrical Rough-In10/7/201910/7/201910/7/2019PPASS
DetailsJames Ady
Contact John for level 1 area 1 ramp. Phone #: ###-#### Inspection requested via web by Tom Betty area 1 ramp 1 only ok to cover
Electrical Rough-In10/2/201910/3/201910/3/2019PPASS
DetailsJames Ady
Cover inspection for the NWPG for level 1 slab 3
Contact electrician on site - John Mittleider
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 1 Slab 3, Ok to cover
Electrical Rough-In8/27/20198/27/20198/27/2019PPASS
DetailsJames Ady
Level GP slab pour #3. Phone #: ###-#### Inspection requested via web by Tom Betty area listed ok to cover
Electrical Rough-In8/19/20198/19/20198/19/2019PPASS
DetailsRock A. Hudson
Concrete pour 1B of Garage level. Phone #: ###-#### Inspection requested via web by Tom Betty Slab pour noted rough in ok cover
Electrical Rough-In8/13/20198/13/20198/13/2019PPASS
DetailsJames Ady
St. Luke''s NW Parking Garage in areas Pour #2 and 1B
Contact Kyle Sharp
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas listed ok to cover
Electrical Rough-In7/18/20197/18/20197/18/2019PPASS
DetailsJames Ady
Underground 4" temporary power at south end of parking garage. Phone #: ###-#### Inspection requested via web by Tom Betty underground ok to cover
Electrical Rough-In7/15/20197/15/20197/15/2019APASS
DetailsJames Ady
Inspect 3 boxes and associated raceways in concrete wall southeast corner of the Parking Garage. Contact Justin a few minutes ahead of arrival as he is working on anther project a few blocks away. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed. Conduits and boxes in concrete walls ok to cover
Electrical Rough-In6/24/20196/25/20196/25/2019APASS
DetailsJames Ady
Underground rough n at electrical room and south of electrical room. Phone #: ###-#### Inspection requested via web by Tom Betty Extension of previous underground ok to cover
Electrical Rough-In6/10/20196/11/20196/11/2019APASS
DetailsJames Ady
Contact John Mittlieder for north underground installation. Phone #: ###-#### Inspection requested via web by Tom Betty 30ft N. S. running duct bank ok to cover
Electrical Rough-In6/7/20196/7/20196/7/2019PPASS
DetailsJames Ady
Underground rough in Northwest corner of building Phone #: ###-#### Inspection requested via web by Tom Betty extension of underground to east and west of electrical room ok to cover
Electrical Rough-In6/5/20196/5/20196/5/2019PPASS
DetailsJames Ady
Contact John for sub basement underground rough in. Phone #: ###-#### Inspection requested via web by Tom Betty UG Next to main Elec. room ok to cover
Electrical Rough-In5/10/20195/14/20195/14/2019APASS
DetailsDaryl DeGrange
Inspect UFER ground in north footing adjacent to State street. Phone #: ###-#### Inspection requested via web by Tom Betty rough-in ok cover 3/0 concrete encased eletrode.