Electrical Rough-In | 7/27/2020 | 7/28/2020 | 7/28/2020 | A | PASS |
Rock A. Hudson
|
|
|
Contact Justin for level 4 comm room walls. Phone #: ###-#### Inspection requested via web by Tom Betty Level 4 comm room walls rough in ok cover.
|
Electrical Rough-In | 7/24/2020 | 7/27/2020 | 7/27/2020 | A | NH |
Rock A. Hudson
|
|
|
Rough In inspection for Level 4 Comm Room. Contact Justin. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Called contact, no answer, must recall for when available.
|
Electrical Rough-In | 7/8/2020 | 7/8/2020 | 7/8/2020 | P | PASS |
James Ady
|
|
|
Rough in inspection for levels GP and 2 Comm room walls. Phone #: ###-#### Inspection requested via web by John Mittleider Area listed walls only ok to cover
|
Electrical Rough-In | 7/6/2020 | 7/7/2020 | 7/7/2020 | A | PASS |
James Ady
|
|
|
Rough in inspection lighting and camera boxes and associated raceways for 6-4 concrete pour Phone #: ###-#### Inspection requested via web by John Mittleider Pour 6-4 ok to cover
|
Electrical Rough-In | 6/4/2020 | 6/5/2020 | 6/5/2020 | P | PASS |
James Ady
|
|
|
Rough in inspection for boxes and raceways in slab 6-3. Phone #: ###-#### Inspection requested via web by John Mittleider 6 floor deck pour ok to cover Pics on file
|
Electrical Rough-In | 5/21/2020 | 5/21/2020 | 5/21/2020 | P | PASS |
Rock A. Hudson
|
|
|
I rough in inspection for device boxes and raceways in ramps pour 6-2. Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
|
Electrical Rough-In | 5/12/2020 | 5/13/2020 | 5/13/2020 | P | PASS |
James Ady
|
|
|
Rough in inspection for elevated deck pour of ramp 6-1. Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
|
Electrical Rough-In | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
James Ady
|
|
|
Rough in inspection for lighting and camera device boxes and raceways in elevated deck pour 5-4. Phone #: ###-#### Inspection requested via web by John Mittleider Areas listed ok to cover
|
Electrical Rough-In | 4/22/2020 | 4/22/2020 | 4/22/2020 | P | PASS |
James Ady
|
|
|
Rough in on pour 5-3 Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
|
Electrical Rough-In | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Rock A. Hudson
|
|
|
Inspect in slab boxes and raceways in ramp pour 5-2 Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
|
Electrical Rough-In | 3/18/2020 | 3/18/2020 | 3/18/2020 | P | PASS |
James Ady
|
|
|
Inspect boxes and raceways in elevated deck pour 5-1. Phone #: ###-#### Inspection requested via web by John Mittleider Level 5 pour 1 ok to cover
|
Electrical Rough-In | 3/10/2020 | 3/10/2020 | 3/10/2020 | P | PASS |
James Ady
|
|
|
Cover inspection for boxes and raceways in elevated deck pour L4-4. Phone #: ###-#### Inspection requested via web by John Mittleider Deck pour listed ok to cover
|
Electrical Rough-In | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | PASS |
James Ady
|
|
|
Rough in inspection for boxes and raceways in elevated deck pour 4-3 Phone #: ###-#### Inspection requested via web by John Mittleider area listed ok to cover
|
Electrical Rough-In | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
James Ady
|
|
|
Rough inspection for in slab boxes and raceways in slab pour 4-2 Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
|
Electrical Rough-In | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Rock A. Hudson
|
|
|
Inspect electrical boxes and raceways in concrete ramp L4-1 Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
|
Electrical Rough-In | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | PASS |
James Ady
|
|
|
Inspect boxes and raceways in elevated deck pour L3-4. Phone #: ###-#### Inspection requested via web by John Mittleider areas listed ok to cover
|
Electrical Rough-In | 1/9/2020 | 1/9/2020 | 1/9/2020 | P | PASS |
Rock A. Hudson
|
|
|
Rough inspection of boxes and raceways in elevated deck pour L3-3. Phone #: ###-#### Inspection requested via web by John Mittleider Pour noted rough in ok cover
|
Electrical Rough-In | 12/26/2019 | 12/27/2019 | 12/27/2019 | P | PASS |
Rock A. Hudson
|
|
|
Rough in inspection for in slab boxes and raceways in slab L3-2 Phone #: ###-#### Inspection requested via web by John Mittleider L3-2 ramp pour rough in ok cover
|
Electrical Rough-In | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PASS |
James Ady
|
|
|
Inspect in slab boxes and raceways in slab L2-4 Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
|
Electrical Rough-In | 12/2/2019 | 12/2/2019 | 12/2/2019 | P | PASS |
James Ady
|
|
|
Rough in in slab boxes and raceway for pour L2 -5. Call John ###-#### Phone #: ###-#### Inspection requested via web by John Mittleider Area listed ok to cover
|
Electrical Rough-In | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
James Ady
|
|
|
In slab raceways and boxes for slab pour ramp 2A. Contact John 208- ###-#### Phone #: ###-#### Inspection requested via web by John Mittleider Level 2 Ramp ok to cover
|
Electrical Rough-In | 11/7/2019 | 11/8/2019 | 11/8/2019 | P | PASS |
James Ady
|
|
|
Contact John for level 2 pour #3 in slab raceways. Phone #: ###-#### Inspection requested via web by Tom Betty Level 2 pour ok to cover
|
Electrical Rough-In | 11/7/2019 | 11/7/2019 | 11/7/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Contact John M. for level 2 pour #3 in slab raceways. Phone #: ###-#### Inspection requested via web by Tom Betty 300.18- Conduit runs shall be installed in complete runs. 352.30- PVC shall be supported at intervals not to exceed 3' for 1/2" thru 1" conduit. Southeast and central east areas conduit installed and supported, about 1/2 of pour. Northeast and northern areas of pour conduit installation not complete at 2pm time of inspection. General contactor must give sufficient time to install raceways. Will recall for Friday AM, pour planned for 3:30pm.
|
Electrical Rough-In | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
James Ady
|
|
|
Contact John for level 1 pour #5 rough in cover inspection. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed ok to covwer
|
Electrical Rough-In | 10/16/2019 | 10/16/2019 | 10/16/2019 | P | PASS |
James Ady
|
|
|
Contact John for level 1 area 4 concrete pour rough in. Phone #: ###-#### Inspection requested via web by Tom Betty Area 4 level 1 concrete pour ok to cover
|
Electrical Rough-In | 10/9/2019 | 10/10/2019 | 10/10/2019 | P | PASS |
James Ady
|
|
|
Contact John for level 1 ramp #2 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 ramp 2 pour only ok to cover
|
Electrical Rough-In | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
James Ady
|
|
|
Contact John for level 1 area 1 ramp. Phone #: ###-#### Inspection requested via web by Tom Betty area 1 ramp 1 only ok to cover
|
Electrical Rough-In | 10/2/2019 | 10/3/2019 | 10/3/2019 | P | PASS |
James Ady
|
|
|
Cover inspection for the NWPG for level 1 slab 3 Contact electrician on site - John Mittleider Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 1 Slab 3, Ok to cover
|
Electrical Rough-In | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PASS |
James Ady
|
|
|
Level GP slab pour #3. Phone #: ###-#### Inspection requested via web by Tom Betty area listed ok to cover
|
Electrical Rough-In | 8/19/2019 | 8/19/2019 | 8/19/2019 | P | PASS |
Rock A. Hudson
|
|
|
Concrete pour 1B of Garage level. Phone #: ###-#### Inspection requested via web by Tom Betty Slab pour noted rough in ok cover
|
Electrical Rough-In | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
James Ady
|
|
|
St. Luke''s NW Parking Garage in areas Pour #2 and 1B Contact Kyle Sharp Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Areas listed ok to cover
|
Electrical Rough-In | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
James Ady
|
|
|
Underground 4" temporary power at south end of parking garage. Phone #: ###-#### Inspection requested via web by Tom Betty underground ok to cover
|
Electrical Rough-In | 7/15/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
James Ady
|
|
|
Inspect 3 boxes and associated raceways in concrete wall southeast corner of the Parking Garage. Contact Justin a few minutes ahead of arrival as he is working on anther project a few blocks away. Phone #: ###-#### Inspection requested via web by Tom Betty Area listed. Conduits and boxes in concrete walls ok to cover
|
Electrical Rough-In | 6/24/2019 | 6/25/2019 | 6/25/2019 | A | PASS |
James Ady
|
|
|
Underground rough n at electrical room and south of electrical room. Phone #: ###-#### Inspection requested via web by Tom Betty Extension of previous underground ok to cover
|
Electrical Rough-In | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | PASS |
James Ady
|
|
|
Contact John Mittlieder for north underground installation. Phone #: ###-#### Inspection requested via web by Tom Betty 30ft N. S. running duct bank ok to cover
|
Electrical Rough-In | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
James Ady
|
|
|
Underground rough in Northwest corner of building Phone #: ###-#### Inspection requested via web by Tom Betty extension of underground to east and west of electrical room ok to cover
|
Electrical Rough-In | 6/5/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
James Ady
|
|
|
Contact John for sub basement underground rough in. Phone #: ###-#### Inspection requested via web by Tom Betty UG Next to main Elec. room ok to cover
|
Electrical Rough-In | 5/10/2019 | 5/14/2019 | 5/14/2019 | A | PASS |
Daryl DeGrange
|
|
|
Inspect UFER ground in north footing adjacent to State street. Phone #: ###-#### Inspection requested via web by Tom Betty rough-in ok cover 3/0 concrete encased eletrode.
|