Final | 10/9/2019 | 10/10/2019 | 10/10/2019 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams Final ok
|
Final | 10/9/2019 | 10/9/2019 | 10/9/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams 300.15 All boxes shall be covered. East show window receptacle, and light 15' in not in. 440.6- Over current protection shall not exceed value on name plate. 45 max 50 amp installed.
|
Electrical Rough-In | 10/4/2019 | 10/4/2019 | 10/4/2019 | P | PASS |
Eric Story
|
|
|
Ceiling grid Phone #: ###-#### Inspection requested via web by Jim Williams Suspended ceiling in back area of electrical area ok to cover
|
Electrical Rough-In | 9/3/2019 | 9/4/2019 | 9/4/2019 | A | PASS |
Rock A. Hudson
|
|
|
Walls only Phone #: ###-#### Inspection requested via web by Jim Williams Walls and bathroom hardlids and dining area soffits rough in ok cover.
|
Electrical Rough-In | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Rock A. Hudson
|
|
|
Underground Phone #: ###-#### Inspection requested via web by Jim Williams Service has been de-energized and moved out of what will be new bathroom. Grounding electrode conductor exended by irreversable crimp. All gear to be changed. Under slab rough in ok cover.
|