Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Lauren Norris...labelling, disconnect, and OCPD ok
|
Final | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | FAIL |
Tom Saunders
|
|
|
Rocky Phone #: ###-####...labelling incomplete
|
Electrical Rough-In | 2/4/2020 | 2/4/2020 | 2/4/2020 | A | PASS |
Tom Saunders
|
|
|
Rocky Phone #: ###-####...listings verified
|
Final | 12/12/2019 | 12/13/2019 | 12/12/2019 | A | CANC |
Tom Saunders
|
|
|
Nathan Phone #: ###-####... discussed with contact...rough in inspection required mid point of install...panels and materials need to be on ground for inspection and wrong fees for permit need addressed before inspection can be done
|