Electrical Rough-In | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Tom Saunders
|
|
|
underground for bollard lights late morning if you can Tom Phone #: ###-#### Inspection requested via web by Todd Hall...feeds ok to cover...GFCI protected circuit in PVC
|
Electrical Rough-In | 6/9/2020 | 6/9/2020 | 6/9/2020 | A | NR |
Tom Saunders
|
|
|
underground inspection for bollard light conduits Phone #: ###-#### Inspection requested via web by Todd Hall...not ready
|
Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 | P | CANC |
Tom Saunders
|
|
|
inspection for pole bases also see pole base inspection scheduled for building 10 Phone #: ###-#### >> Inspection requested via web by Todd Hall Inspection cancelled from web by: Todd Hall
|
Electrical Rough-In | 6/3/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Tom Saunders
|
|
|
pole base inspection Phone #: ###-#### Inspection requested via web by Todd Hall... ok to pour
|
Electrical Rough-In | 5/28/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
Tom Saunders
|
|
|
inspection for carport power riser conduits Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
|
Electrical Rough-In | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | FAIL |
Tom Saunders
|
|
|
ceiling drops bldg 10 Phone #: ###-#### Inspection requested via web by Todd Hall.... 1) NMB/Romex shall be strapped and supported by staples or approved means...334.30 2)NMB/romex shall be protected a minimum 1/4" from face of material...taping to T channel not acceptable means
|
Electrical Rough-In | 4/29/2020 | 4/29/2020 | 4/29/2020 | A | PASS |
Tom Saunders
|
|
|
ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall...corrected..ok to cover
|
Rough-In Permanent Service | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | PASS |
Tom Saunders
|
|
|
building 10 (12 plex) all units if possible Phone #: ###-#### Inspection requested via web by Todd Hall... 12 units ok to cover p/s u/g new ok...13 meters
|
Electrical Rough-In | 3/11/2020 | 3/11/2020 | 3/11/2020 | A | PASS |
Tom Saunders
|
|
|
Todd Phone #: ###-####...breezeway ceilings ok to cover
|
Electrical Rough-In | 3/3/2020 | 3/3/2020 | 3/3/2020 | A | PASS |
Mark Moncarr
|
|
|
breezeways and West wall for cover of panel feeders. Please call Todd to discuss previous underground inspection Phone #: ###-#### Inspection requested via web by Todd Hall Ok cover breezeway all floors and 1st floor W wall for feeders.
|
Temporary Service | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Daryl DeGrange
|
|
|
T/S U/G N OK
|
Electrical Rough-In | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Tom Saunders
|
|
|
underground for carports and pole lights at building #10 contact Todd ###-#### Phone #: ###-#### Inspection requested via web by Todd Hall...ok to cover
|