Electrical Rough-In | 8/10/2020 | 8/10/2020 | 8/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
L4 deck pour 3 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Pour noted rough in ok cover
|
Electrical Rough-In | 6/1/2020 | 6/1/2020 | 6/1/2020 | P | PASS |
Rock A. Hudson
|
|
|
L3 PT deck pour #2 Call Craig ( Could Do AM inspection it is ready) Phone #: ###-#### Inspection requested via web by Tom Betty Pour noted rough in ok cover.
|
Electrical Rough-In | 5/11/2020 | 5/11/2020 | 5/11/2020 | A | PASS |
Rock A. Hudson
|
|
|
L3 deck pour #1 Phone #: ###-#### Inspection requested via web by Tom Betty Pour noted rough in ok cover
|
Electrical Rough-In | 4/14/2020 | 4/14/2020 | 4/14/2020 | P | PASS |
Rock A. Hudson
|
|
|
PT deck L2 pour2 Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Pour covers south side of level 2 and ramp to level 3, rough in ok cover
|
Electrical Rough-In | 3/25/2020 | 3/25/2020 | 3/25/2020 | A | PASS |
Rock A. Hudson
|
|
|
Piping for L2 PT deck Phone #: ###-#### Inspection requested via web by Tom Betty A set of stamped city approved set of prints on site, confirmed. Conference for in floor boxes along rails located on level 2 of live works units, west wall, ok to be slightly over 6' from start of wall to receptacle as required by 210.52(A). Structural cables and rebar require a minimum clearance of non stuctural components. Area noted level 2 PT deck pour rough in ok cover.
|
Electrical Rough-In | 3/6/2020 | 3/10/2020 | 3/10/2020 | A | PASS |
Eric Story
|
|
|
L1 PT deck Call John Phone #: ###-#### Inspection requested via web by Tom Betty Lvevel 1 PT deck ok to cover
|
Electrical Rough-In | 2/28/2020 | 2/28/2020 | 2/28/2020 | A | PASS |
Rock A. Hudson
|
|
|
Underground retail and lobby Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Under slab for areas noted rough in ok cover.
|
Electrical Rough-In | 2/26/2020 | 2/26/2020 | 2/26/2020 | A | PASS |
Rock A. Hudson
|
|
|
Underground future retail Phone #: ###-#### Inspection requested via web by Tom Betty Parking normally open at job trailers just to west building across 4th street accessed from myrtle turning north on alley between 4th and 5th. Northwest TI underground rough in ok cover.
|
Electrical Rough-In | 2/24/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Rock A. Hudson
|
|
|
Underground pipe for fire pump room and live works Phone #: ###-#### Inspection requested via web by Tom Betty Asked for city approved set of prints, general foreman unable to located. Will verify next trip. Area noted underslab rough in ok cover.
|
Rough-In Permanent Service | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | CANC |
Rock A. Hudson
|
|
|
underground service pipe runs Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Needed RI inspection
|
Electrical Rough-In | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Rock A. Hudson
|
|
|
underground service pipe runs Call Craig Phone #: ###-#### Inspection requested via web by Tom Betty Service entrance conduits under slab at bottom of ramp and under slab under electrical room rough in ok cover
|
Electrical Rough-In | 11/20/2019 | 11/21/2019 | 11/21/2019 | A | PASS |
Rock A. Hudson
|
|
|
Uffer groung inspection. Please call Craig Timmons 10 minutes before heading to the inspection so he can meet you there. Craig has a couple of questions he needs clarification on. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Concrete encased on S.E. corner rouhg in ok cover.
|
Conference | 11/21/2019 | 11/21/2019 | 11/21/2019 | P | PASS |
Rock A. Hudson
|
|
|
Uffer groung inspection. Please call Craig Timmons 10 minutes before heading to the inspection so he can meet you there. Craig has a couple of questions he needs clarification on. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek 230.6- Discussed service entrance conductors pathway to level 3. As per print 2nd service located on level 3. Service entrance conductors shall either be concidered outside building or be encased in concrete or brick to be concidered outside building. Discussed common grounding electrode discribed in 250.58.
|