Final | 2/27/2020 | 2/27/2020 | 2/27/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender Final ok
|
Permanent Service | 2/17/2020 | 2/18/2020 | 2/18/2020 | A | PASS |
Daryl DeGrange
|
|
|
###-#### Phone #: ###-#### Inspection requested via web by kendall bender p/s o/h rec ok
|
Electrical Rough-In | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | PASS |
Rock A. Hudson
|
|
|
Mike Anderson if there are any questions Phone #: ###-#### Inspection requested via web by kendall bender Rough in ik cover
|
Electrical Rough-In | 12/4/2019 | 12/4/2019 | 12/4/2019 | P | PASS |
Rock A. Hudson
|
|
|
Mike Anderson if there are any questions Phone #: ###-#### Inspection requested via web by kendall bender Grounding electrode system rough in ok cover rest rough in ok cover
|
Electrical Rough-In | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by kendall bender 210.52(A)- No point measured along floor line shall be more than 6' from a receptacle outlet. Up bed 14' between receptacles, 250.32- Grounding electrodes shall be terminated at detached building disconnecting means not sub-panel. #4 bare. 300.4- Nail plates needed up storage by switch and down bed in closet. 334.30- NM shall be secured at intervals not to exceed 4 1/2'. At least 3 locations.
|