Final | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Brad Hoots Final ok
|
Electrical Rough-In | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PASS |
Rock A. Hudson
|
|
|
Above Ceiling inspection. If possible call 30 minuets before so Dan can meet you. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Level 2 corridor grid rough in ok cover
|
Electrical Rough-In | 11/26/2019 | 11/26/2019 | 11/26/2019 | P | PASS |
Rock A. Hudson
|
|
|
Wall and ceiling rough-in. New 2nd floor corridor behind the lobby elevators. Phone #: ###-#### Inspection requested via web by Brad Hoots Level 2 corridor walls only rough in ok cover.
|