Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberELE19-04799
StatusIssued
Name MOUNTAIN POWER ELECT
Site Address 200 W MYRTLE ST
Project Name 
Customer Number19-044
ePlanReviewNo
Description
New: Provide the underground electrical work associated with the 3rd and Myrtle project.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Conference8/12/20208/12/20208/12/2020PPASS
DetailsRock A. Hudson
Discussed grounding requirements of each service. Bonding of grounded conductor completed in vault. Parallel grounded conductors and grounding conductor installed from vault to each service disconnecting means . As per 250.24 (A),(B), and (C) stating a main bonding jumper shall be installed at each service disconnecting means connecting the grounded conductor to the enclosure and equipment grounds. This requirement will create a parallel path between the grounded conductors and the grounding conductor from vault to each service. To comply with 250.24 the equipment ground from the vault to each service will need to be removed, or abandoned and as permitted by 250.142 non-current carrying metal of service enclosure will bond thru the grounded conductors.
Electrical Rough-In8/4/20208/4/20208/4/2020PPASS
DetailsRock A. Hudson
2 pole light bases on 5th floor amenity deck Phone #: ###-#### Inspection requested via web by Jason Parke Pole bases noted rough in ok cover.
Electrical Rough-In7/20/20207/21/20207/21/2020PPASS
DetailsRock A. Hudson
Final elevated deck rough in. West side area A level 5 Phone #: ###-#### Inspection requested via web by Jason Parke Level 5 final pour rough in ok cover
Electrical Rough-In7/14/20207/14/20207/14/2020PPASS
DetailsRock A. Hudson
4th floor 3'' pour strip. 4 conduits passing through. Phone #: ###-#### Inspection requested via web by Jason Parke Area noted inspected through photos rough in ok cover.
Conference6/30/20207/1/20207/1/2020APASS
DetailsDaryl DeGrange
Conference to inspect and discuss bonding in structural concrete around pool area Phone #: ###-#### Inspection requested via web by Jason Parke Discussed and visually observed 4 corner pool bonding stingers stubs, bonding conductor ran back to 4th floor pool equipment room. Pool completion awarded to other pool company, separate permit required.
Electrical Rough-In6/30/20207/1/20207/1/2020APASS
DetailsDaryl DeGrange
Elevated concrete deck rough in- area A level 5 Phone #: ###-#### Inspection requested via web by Jason Parke Rough-in ok cover/ pour Level 5 Eastern half of Area A
Electrical Rough-In6/25/20206/26/20206/26/2020APASS
DetailsRock A. Hudson
Level 3 pour strip between areas A and B. Concrete deck rough in Phone #: ###-#### Inspection requested via web by Jason Parke Contact informed of a possible case of covid-19. Verified thru photos. Area noted rough in ok cover
Conference6/25/20206/25/20206/25/2020PPASS
DetailsRock A. Hudson
Need to discuss pool area bonding. Rebar in deck area surrounding pool to be epoxy coated (non conductive).Can be tele-conference Phone #: ###-#### Inspection requested via web by Jason Parke
We will be on site site next morning and will assess pool bonding at that time.
Conference6/23/20206/24/20206/24/2020APASS
DetailsRock A. Hudson
Conference to discuss the connection of the fire pump Phone #: ###-#### Inspection requested via web by Jason Parke Discussed supply conductors and equipment on supply side of fire pump service. Service entrance conductor travel underground from Idaho power vault to a CT can then to fire pump controller. CT can shown on wall out of fire pump room. Explained supply side conductors shall be installed as service entrance conductors and shall be physically outside building or installed as per 230.6 concidered outside the building as per 695.6(A)(1). CT can will be required to be located in same room as fire pump for fire protection or relocate CT meter to transformer with service entrance to directly enter fire pump service disconnecting means.
Conference6/18/20206/18/20206/18/2020PPASS
DetailsRock A. Hudson
Need to discuss auxiliary gutters at meter pak main disconnects Phone #: ###-#### Inspection requested via web by Jason Parke
Discussed the use of an auxiliary gutter to extend form the bottom of main disconnecting means down to where service entrance conduits are miss- aligned with botton of disconnect. As per the definition auxiliar gutter is a sheet metal or non metallic gutter is use to extend a piece of equipment to provide additional wiring space. Service entrance conduits will be encased in concrete to the entry of the main disconnect extension or auxiliary gutter in compliance with 230.6 or concidered outside of structure. Auxiliary gutter ok to use.
Electrical Rough-In6/12/20206/15/20206/15/2020APASS
DetailsRock A. Hudson
Area A level 4 elevated concrete deck rough in Phone #: ###-#### Inspection requested via web by Jason Parke Discussed when areas can be wired and wiring methods permitted. 334.10- NM cable ok in type 3, 4, and 5 construction. (Wood). Wiring methods rated for damp locations can be installed any time, wiring methods rated for dry locations are install at own risk. If exposed to moisture must be replaced. Area noted pour rough in ok cover.
Electrical Rough-In6/11/20206/12/20206/12/2020APASS
DetailsRock A. Hudson
Grounding at structural pool shell- not actual pool- just structural surrounding Phone #: ###-#### Inspection requested via web by Jason Parke
As noted previous confirmed non conductive coating on rebar around pool area. Pool shell will have all bonding required by article 680.
Electrical Rough-In6/5/20206/5/20206/5/2020APASS
DetailsRock A. Hudson
North island parking equipment underground Phone #: ###-#### Inspection requested via web by Jason Parke
East entrance north island underground rough in ok cover.
Electrical Rough-In6/4/20206/4/20206/4/2020APASS
DetailsRock A. Hudson
Underground at alley and parking equipment island Phone #: ###-#### Inspection requested via web by Jason Parke
Central alley, east parking entrance south island underground rough in ok cover.
Electrical Rough-In5/28/20205/28/20205/28/2020APASS
DetailsRock A. Hudson
Area A level 3 elevated concrete deck rough in Phone #: ###-#### Inspection requested via web by Jason Parke
Level 3 as noted pour rough in ok cover
Conference5/26/20205/26/20205/26/2020PPASS
DetailsRock A. Hudson
Discuss bonding at pool shell area. Rebar in structural concrete (not pool) to utilize epoxy coated rebar Phone #: ###-#### Inspection requested via web by Jason Parke
Called and discussed if an epoxy covered rebar is used below pool shell, question about bonding.
680.26(B)(3)- A rebar encapsulated in a non-conductive covering shall not be required to be bonded.
Electrical Rough-In5/12/20205/12/20205/12/2020APASS
DetailsRock A. Hudson
Top concrete deck rough in. All sleeves- no conduit, no boxes. Phone #: ###-#### Inspection requested via web by Jason Parke Rough in ok cover
Electrical Rough-In4/28/20204/29/20204/29/2020APASS
DetailsRock A. Hudson
Elevated concrete deck rough in. Podium deck north and northeast Phone #: ###-#### Inspection requested via web by Jason Parke
Podium deck sleeves only rough in ok cover.
Conference4/21/20204/22/20204/22/2020APASS
DetailsRock A. Hudson
Can be teleconference or video conference to discuss construction, installation, and grounding of pool and structure at the 5th floor amenity deck. Phone #: ###-#### Inspection requested via web by Jason Parke
Met Jason on site and discussed bonding of pool located on level 5. As per 680.26 bonding of shell, ladders, and perimeter however perimeter is elevated pavers. An equipotential bond will need to be installed under pavers on top of stands to bond potential wet perimeter surface. When in dought we will be bonding any and all areas needed.
Electrical Rough-In4/13/20204/14/20204/14/2020PPASS
DetailsRock A. Hudson
Elevated deck rough in
4th floor northwest corner Phone #: ###-#### Inspection requested via web by Jason Parke
Pour noted rough in ok cover.
Electrical Rough-In4/6/20204/7/20204/7/2020APASS
DetailsRock A. Hudson
Elevated deck rough in
north and east side level 4 Phone #: ###-#### Inspection requested via web by Jason Parke
Pour noted rough in ok cover.
Electrical Rough-In4/3/20204/3/20204/3/2020PPASS
DetailsRock A. Hudson
Elevated concrete deck rough in
4th floor deck over alley area Phone #: ###-#### Inspection requested via web by Jason Parke
Area noted pour rough in ok cover
Electrical Rough-In3/26/20203/26/20203/26/2020PCANC
DetailsRock A. Hudson
Elevated deck rough in
Phone #: ###-#### Inspection requested via web by Jason Parke Duplicate request
Electrical Rough-In3/26/20203/26/20203/26/2020APASS
DetailsRock A. Hudson
Elevated deck rough in
As late AM as possible Phone #: ###-#### Inspection requested via web by Jason Parke
Level 3 to 4 pour rough in ok cover
Electrical Rough-In3/14/20203/16/20203/16/2020PPASS
DetailsRock A. Hudson
Elevated concrete deck rough in
3rd floor deck gridline H to gridline A Phone #: ###-#### Inspection requested via web by Jason Parke Area noted pour rough in ok cover.
Electrical Rough-In3/11/20203/12/20203/12/2020PPASS
DetailsRock A. Hudson
Elevated concrete deck rough in
Area over alley Phone #: ###-#### Inspection requested via web by Jason Parke
GFCI protection provided for temp power skid located level 2.
Discussed allowing general contractor to close a portion of level 4 while wiring on upper levels not complete. As an electrical inspector I am not able to grant general contractor ok to cover any areas where wiring not complete and without the request of electrical contractor permitted to complete scope of work.
Area noted pour rough in ok cover.
Electrical Rough-In3/3/20203/3/20203/3/2020PCANC
DetailsEric Story
Slab rough in Phone #: ###-#### Inspection requested via web by Jason Parke
Electrical Rough-In3/2/20203/3/20203/3/2020APASS
DetailsEric Story
Elevated concrete slab rough in Phone #: ###-#### Inspection requested via web by Jason Parke
3rd pour from 2nd ramp to 3rd ok to cover conduits and lights
Electrical Rough-In2/25/20202/26/20202/26/2020PPASS
DetailsRock A. Hudson
Area A underground Phone #: ###-#### Inspection requested via web by Jason Parke City approved set of prints on site.
Area (A) underslab rough in ok cover
Electrical Rough-In2/17/20202/18/20202/18/2020APASS
DetailsRock A. Hudson
elevated concrete deck Phone #: ###-#### Inspection requested via web by Jason Parke
Pour proceeded prior to inspection due to prior inspection covered large portion of pour. We are OK on this pour and will be seeing all furture areas prior. Above grid line D rough in ok cover.
Electrical Rough-In2/12/20202/12/20202/12/2020PPASS
DetailsRock A. Hudson
Elevated deck rough in Phone #: ###-#### Inspection requested via web by Jason Parke
Deck pour to grid line "D" rough in ok cover.
Electrical Rough-In1/30/20201/31/20201/31/2020APASS
DetailsEric Story
Elevated post tension concrete deck rough in Phone #: ###-#### Inspection requested via web by Jason Parke
1st deck conduits install @boxes ok to pour
Electrical Rough-In1/9/20201/10/20201/10/2020APASS
DetailsRock A. Hudson
UFER ground at footing north of MSB1 Phone #: ###-#### Inspection requested via web by Jason Parke
Concrete encased electrode, footing sleeves, service entrance conduits up column rough in ok cover.
Electrical Rough-In1/7/20201/7/20201/7/2020APASS
DetailsRock A. Hudson
Underground stub ups at panels Phone #: ###-#### Inspection requested via web by Jason Parke
Underground stubs at panelssouth east corner and east branch underground with runs to car charging stations rough in ok cover.
Electrical Rough-In1/2/20201/3/20201/3/2020APASS
DetailsRock A. Hudson
Underground feeders east side Phone #: ###-#### Inspection requested via web by Jason Parke
Discussed the installation of low voltage traffic signal loops for gated entrances to be preinstalled in conduits with entry and exit in a "T" conduit body directly poured in concrete to be ok due to cannot be field replaced. Will need completely dug up and replaced if fails.
East feeder conduits underground headed east and turn south towards column rough in ok cover.
Electrical Rough-In12/19/201912/19/201912/19/2019PPASS
DetailsRock A. Hudson
Underground to sump pit Phone #: ###-#### Inspection requested via web by Jason Parke Underground to lower sump pit rough in ok cover
Electrical Rough-In12/16/201912/17/201912/17/2019APASS
DetailsRock A. Hudson
Underground through middle stem wall Phone #: ###-#### Inspection requested via web by Jason Parke
Middle stem wall underground and service entrance in S.E. and N.W. columns rough in ok cover