Permit NumberELE19-04951
StatusFinaled
Name R M E INC
Site Address 3120 N WOODY DR
Project Name 
Customer Number31333
ePlanReviewNo
Description
Alteration or Repair: Install new 200A CSED and Install circuit to hot tub.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/24/20201/27/20201/27/2020APASS
DetailsMark Moncarr
Please call the homeowner Dennis at ###-#### 20 minutes before arrival so he can meet you there. Thank you Phone #: ###-#### Inspection requested via web by Steve Blackmer Ok final.
Final1/22/20201/23/20201/23/2020ANH
DetailsEric Story
hot tub is full of water and ready for use. Thank You- Steve Phone #: ###-#### Inspection requested via web by Steve Blackmer
Nobody at home
Permanent Service1/16/20201/17/20201/17/2020APASS
DetailsMark Moncarr
IPCO and RME will be onsite 9-10AM. New UG lateral conduit was inspected by IPCO. RME installed sch80 and expansion into meter base. IPCO will disconnect and RME will remove mast and Service conductors and install OEM blank over hub. IPCO will pull new feeder and terminate Phone #: ###-#### Inspection requested via web by Steve Blackmer Changed overhead drop to underground. p/s u/g n ok
Final1/16/20201/17/20201/17/2020ACANC
DetailsMark Moncarr
Hot tub and service change complete and ready for final Phone #: ###-#### Inspection requested via web by Steve Blackmer Coordinate with homeowner once tub is filled with water, then call back in for final.
Permanent Service12/31/20191/2/20201/2/2020PPASS
DetailsMark Moncarr
Contact is Greg. ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer There is a hot tub under service drop on property. Hot tub is not filled with water nor hooked up. Met and talked with homeowner about 10' horizontal clearence requirements. I mentioned going undergrouind with IDP power, or moving tub. p/s o/h rec ok