Final | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Mark Moncarr
|
|
|
Ok final.
|
Final | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | CANC |
Mark Moncarr
|
|
|
Cover inspection for grid ceiling and final inspection for the entire project. Phone #: ###-#### Inspection requested via web by Steve Craig Talked to contractor, rescheduled for 2/27
|
Electrical Rough-In | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mark Moncarr
|
|
|
Rough in cover of walls. Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover walls and grd work for 2 floor box location.
|