Final | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | PASS |
James Ady
|
|
|
Zach on site. Inspection requested via web by Garrett Collins final ok
|
Electrical Rough-In | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
James Ady
|
|
|
Zach on site. Phone #: ###-#### Inspection requested via web by Garrett Collins Shower wall and E and W entry walls ok to cover
|
Electrical Rough-In | 2/19/2020 | 2/20/2020 | 2/20/2020 | A | PASS |
James Ady
|
|
|
Miles on site. Partial inspection. Site orientation. Phone #: ###-#### Inspection requested via web by Garrett Collins Exterior side of restroom walls only ok to cover.
|