Final | 6/9/2020 | 6/10/2020 | 6/10/2020 | A | PASS |
Rock A. Hudson
|
|
|
The requested GFCI breakers have been installed and facility is now ready for final inspection. Phone #: ###-#### Inspection requested via web by Joe McLean Final ok
|
Final | 6/8/2020 | 6/9/2020 | 6/9/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Facility is ready for final inspection. Please contact Jeff with any questions or concerns. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean 210.8(B)- All receptacles 3 phase up to 100 amp and single phase up to 50 amp located in kitchen areas shall have GFCI protection. Esspresso and oven.
|
Conference | 5/26/2020 | 5/26/2020 | 5/26/2020 | P | FAIL |
Rock A. Hudson
|
|
|
We need to confer with inspector prior to installing owner supplied lighting fixtures. Please call Jeff ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean Looked at luminaires and all packaging, unable to locate a listing accepted by the US. 110.3(B)- All electrical equipment shall be tested and approved by an acceptable testing company. These luminaires are not to be installed unless field evaluated and approved prior to installation. Photos of packaging and instructions taken.
|
Electrical Rough-In | 4/27/2020 | 4/28/2020 | 4/28/2020 | A | PASS |
Rock A. Hudson
|
|
|
There were 4 window receptacles installed that need to be inspected prior to cover. Please contact Jeff with any questions. ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean Access shall be provided for junction boxes above hardlid. Along south wall 1 center of west window and 1 for next widow to east. Hardlids rough in ok cover.
|
Electrical Rough-In | 4/24/2020 | 4/27/2020 | 4/27/2020 | A | PASS |
Rock A. Hudson
|
|
|
In need of a rough-in inspection prior to cover. Please call Brenden with any issues. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean Show window receptacles and circuits not included on print, will be required as per 210.62. Wall rough in only ok cover
|
Electrical Rough-In | 4/17/2020 | 4/17/2020 | 4/17/2020 | P | PASS |
Rock A. Hudson
|
|
|
There was some additional underground installation that needs to be inspected. Please call Jeff with any questions at ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean Called and informed the violation of 240.24(E)- Overcurrent devices shall not be located in a bathroom. Offered a solution of creating a seperation by enclosing panel behind a door but to be careful to make sure all required work space is present at time of final as per 110.26. Underground extension rough in ok cover.
|
Electrical Rough-In | 3/25/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Eric Story
|
|
|
The underground electrical conduits need inspected prior to pouring concrete. Please call Jeff ###-#### with any questions or issues. Phone #: ###-#### Inspection requested via web by Joe McLean Approved plans on-site U/G ok to cover
|