Permit Information
Permit NumberELE20-00377
StatusFinaled
Name NEW LEAF ELECTRIC
Site Address 2813 N ELDORADO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Adding receptacles on the back of the house, adding a welding receptacle in the garage, and extending a 110 circuit for a new receptacle also in the garage. // Adding 200 amp perm. service panel, adding new 220v branch circuit from new panel. -GDB 2-18-2020
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/19/20202/21/20202/21/2020APASS
DetailsMark Moncarr
Upgraded service panel to new 200 amp all-in-one on back of house. This now feeds original bkr panel in the house and an existing sub panel in the garage (which we pulled a ground into.) Installed 2 new circuits in the garage (120v recep and 240v welding recep) and 3 circuits on the back of the house. All new circuits are from all-in-one meter panel.
Homeowner is Darin Franklin (2087031654), he said he''d be there to show you around. Any questions, of if you want me to meet there just give me 15 min notice, at 2087898804. Thanks ~Dan Phone #: ###-#### Inspection requested via web by Dan Hilke Ok final.
Permanent Service2/4/20202/4/20202/4/2020PPASS
DetailsTom Saunders
Should be ready to restore power early afternoon. Phone #: ###-#### Inspection requested via web by Dan Hilke...
p/s o/h reconnect ok
Conference1/31/20201/31/20201/31/2020PPASS
DetailsTom Saunders
Existing wiring very messy, and I need to know how much I have to make right. Phone #: ###-#### Inspection requested via web by Dan Hilke....
discussed existing wiring at house
service change is required to satisy what homeowner is wanting...existing 2 sub panels need attention...interior home panel is 3 wire and garage panel is overloading main service-125A max rating at main service panel...contractor to down size breaker at main service feeding added exterior sub panel that contractor added trying to clean up main service...grounding will be brought up to code by second ground rod when changing service to 200A all-in-one...future work will require future rough/perm service/final inspections...this was conference only