Final | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | PASS |
Rock A. Hudson
|
|
|
Please contact Garrett at ###-#### 1/2 hour prior to being there for the inspection. Phone #: ###-#### Inspection requested via web by Lynn Proctor Final ok
|
Electrical Rough-In | 3/11/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Rock A. Hudson
|
|
|
Please call Lynn prior to arrival. A grid inspection is needed. Phone #: ###-#### Inspection requested via web by Lynn Proctor Grid and sign facade rough in ok cover.
|
Electrical Rough-In | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PASS |
Rock A. Hudson
|
|
|
Please call Lynn prior to arrival. Phone #: ###-#### Inspection requested via web by Lynn Proctor Called Gemma and had ELE attached to BLD19-03683 for interior remodel not BLD for exterior facade. Informed wireman a seperate ELE will be required for exterior BLD. Confirmed city approved set of prints on site. Interior walls, hardlids, soffit rough in ok cover
|
Electrical Rough-In | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | PASS |
Mark Moncarr
|
|
|
An Underground Inspection is needed. Please call Dan prior to arrival. Phone #: ###-#### Inspection requested via web by Lynn Proctor Ok cover grd work S side length of building to panel W side.
|