Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberELE20-00453
StatusFinaled
Name CURRENT ELECTRIC COMPANY
Site Address 315 W HOWE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: electrical for new master bedroom and bathroom addition, relocate electrical service,
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final6/18/20206/18/20206/18/2020APASS
DetailsDaryl DeGrange
home owner will be home Phone #: ###-#### Inspection requested via web by steve sellers final ok
Electrical Rough-In5/4/20205/4/20205/4/2020PPASS
DetailsRock A. Hudson
under tile floor heat in master bathroom, call for access Phone #: ###-#### Inspection requested via web by steve sellers
Floor heat rough in ok cover
Permanent Service3/23/20203/23/20203/23/2020PPASS
DetailsRock A. Hudson
200 amp overhead service, with two ground rods Phone #: ###-#### Inspection requested via web by steve sellers p/s o/h rec ok
Electrical Rough-In3/20/20203/20/20203/20/2020PPASS
DetailsJames Ady
Addition and entrance to is at back of house Phone #: ###-#### Inspection requested via web by steve sellers M. bed, bath, closet and living rm ok to cover
Conference3/13/20203/13/20203/13/2020PDONE
DetailsJames Ady
Call to meet on site could possibly discuss per phone call Phone #: ###-#### Inspection requested via web by steve sellers Discussed clearances over roof for service drop. 230.24A exception No.2: Where voltage between conductors does not exceed 300V clearance over roof with a 4:11 pitch can be lowered to 3ft.(Idaho power will not allow mast to be raised to allow for higher clearance)