Final | 6/29/2020 | 6/29/2020 | 6/29/2020 | A | PASS |
Mark Moncarr
|
|
|
Ok final house. Talked to Mike with B&B, conduits and front light concrete bases are being removed as the bases were poured in wrong areas. Homeowner is removing all of it and will be redone at later date. Asked Mike to inform homeowner that another permit will need to be pulled in order to do new front post lights.
|
Final | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PASS |
Mark Moncarr
|
|
|
Thank You Phone #: ###-#### Inspection requested via web by Eric Brown Ok final.
|
Electrical Rough-In | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Mark Moncarr
|
|
|
floor heat in master bathroom and main bathroom Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover floor heat main and mstr.
|
Electrical Rough-In | 3/10/2020 | 3/11/2020 | 3/11/2020 | A | PASS |
Mark Moncarr
|
|
|
Underground, post light conduit Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover 2-2" conduits at front of property
|
Electrical Rough-In | 2/24/2020 | 2/24/2020 | 2/25/2020 | P | PASS |
Mark Moncarr
|
|
|
Ok cover kitchen, E wall office and main bath. Everything else fished in. In office with back side of fireplace showing will have floor up shelves on both sides. Existing panel in laundry room will need to have proper working clearance upon final. Call Mark with questions on layout, and existing panel in laundry room.
|
Conference | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | CANC |
Mark Moncarr
|
|
|
Review remodel Phone #: ###-#### Inspection requested via web by mike brown Changed to RI inspection
|