Final | 7/4/2020 | 7/6/2020 | 7/6/2020 | A | PASS |
Mark Moncarr
|
|
|
Home owner will be there. Work done was in kitchen and back hallway and bed, laundry , bath Phone #: ###-#### Inspection requested via web by David McClellan Ok final. ARC fault brkr in exterior all in one.
|
Electrical Rough-In | 4/14/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Rock A. Hudson
|
|
|
House is vacant. Access is wide open in rear. New added Master bed, 2 baths, sub-panel in garage, dining rm ; laundry, rewired kitchen, added hardwired smokes throughout. Phone #: ###-#### Inspection requested via web by David McClellan Kitchen and addition rough in ok cover.
|
Electrical Rough-In | 4/8/2020 | 4/9/2020 | 4/8/2020 | A | CANC |
Mark Moncarr
|
|
|
house is vacant. back is wide open around east side. New master bed, bath, laundry, dining, remodeling kitchen and added smokes throughout. Phone #: ###-#### >> Inspection requested via web by David McClellan Inspection cancelled from web by: David McClellan
|
Rough-In Permanent Service | 3/23/2020 | 3/26/2020 | 3/26/2020 | P | PASS |
Mark Moncarr
|
|
|
New meter main on rear east (driveway) side of house. Phone #: ###-#### Inspection requested via web by David McClellan No RI at this time. p/s u/g n ok
|