Final | 5/22/2020 | 5/22/2020 | 5/22/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Card signed. Final ok
|
Final | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PART |
Rock A. Hudson
|
|
|
Temp Final Phone #: ###-#### Inspection requested via web by Kerri Hamilton Waiting on lighting commissioning report as per IECC 408.3.1.
|
Final | 5/19/2020 | 5/19/2020 | 5/19/2020 | P | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton IECC 408.3.1- Prior to passing final inspection, the design professional shall provide evidence that the lighting control systems have been tested to ensure that control hardware and software are calibrated, adjusted, programmed and in proper working condition with the construction documents and manufacturers instructions. 210.8(B)- All receptacle outlets located with in 6' of a sink shall have GFCI proteciton. Refrigerator receptacles.
|
Electrical Rough-In | 5/5/2020 | 5/6/2020 | 5/6/2020 | A | PASS |
Rock A. Hudson
|
|
|
screened // Kaden Phone #: ###-#### South corridor grid rough in ok cover
|
Electrical Rough-In | 5/4/2020 | 5/5/2020 | 5/5/2020 | A | PART |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Except south corridor around restrooms, rest of grid rough in ok cover.
|
Electrical Rough-In | 5/1/2020 | 5/4/2020 | 5/4/2020 | P | CANC |
Rock A. Hudson
|
|
|
Late afternoon please Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
|
Conference | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | CANC |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Wrong permit requested.
|
Electrical Rough-In | 3/24/2020 | 3/25/2020 | 3/25/2020 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton ' Wall rough in ok cover
|