Electrical Rough-In | 7/21/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Tom Saunders
|
|
|
before 1:30 if possible. Phone #: ###-#### Inspection requested via web by Scott Campbell...
inner offices ceiling grid ok to cover
|
Electrical Rough-In | 7/10/2020 | 7/13/2020 | 7/13/2020 | A | PASS |
Eric Story
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Campbell Ceilings as indicated on print ok to cover
|
Electrical Rough-In | 6/25/2020 | 6/26/2020 | 6/26/2020 | P | CANC |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Campbellrough-in ok cover walls conference room #141, #162
|
Electrical Rough-In | 6/23/2020 | 6/24/2020 | 6/24/2020 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Campbell... Phase 2 walls for offices,conf rms, and phone rms...marked on plans...ok to cover
|
Conference | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Campbell... discussed wiring of existing RTU...whats in field power wiring vs manufacturers wiring...sealtite of field wiring will be addressed and fixed-extended to protect wires
|
Electrical Rough-In | 4/27/2020 | 4/27/2020 | 4/27/2020 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Campbell...interior ceiling drops for cans x 3 areas...cans will be cut in after sheetrock installed
|
Conference | 4/23/2020 | 4/23/2020 | 4/23/2020 | P | PASS |
Tom Saunders
|
|
|
Before 2:30 if possible please. Phone #: ###-#### Inspection requested via web by Scott Campbell...discussed floor outlet requirement in meeting rm...there is no division dividing the 430sq foot space...required floor outlet will have space for multiple recps meeting required outlets for space.
|
Electrical Rough-In | 4/13/2020 | 4/13/2020 | 4/13/2020 | P | PASS |
Tom Saunders
|
|
|
Treon 208 927 2383 Phone #: ###-#### Inspection requested via web by Scott Campbell.. underground for floor boxes...ok to cover
|
Electrical Rough-In | 4/6/2020 | 4/6/2020 | 4/6/2020 | P | PASS |
Tom Saunders
|
|
|
Treon 208 972 2383 Phone #: ###-#### Inspection requested via web by Scott Campbell..
wall cover for breakroom walls N & S offices and conferences all marked and initialed on print
|
Electrical Rough-In | 3/30/2020 | 3/31/2020 | 3/31/2020 | A | PASS |
Mark Moncarr
|
|
|
Treon 208 972 2383 Phone #: ###-#### Inspection requested via web by Scott Campbell Ok cover 6 conf rooms, 4 phone rooms, mother's room and 6 offices on N side.
|
Conference | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PASS |
Tom Saunders
|
|
|
Treon 208 972 2383 Phone #: ###-#### Inspection requested via web by Scott Campbell... discussed layout and number of receptacles for conference room...wall and floor discussed top down one siding for ducting only and panel mounting for electrical room discussed boarder tiling of ceiling and not allowing per city ordinance discussed future inspection scheduling
|