Permanent Service | 4/7/2020 | 4/8/2020 | 4/8/2020 | A | PASS |
Mark Moncarr
|
|
|
This is a permanent service re-inspection for the well only. Phone #: ###-#### Inspection requested via web by Paula Gratiot p/s u/g n ok
|
Permanent Service | 4/6/2020 | 4/7/2020 | 4/7/2020 | A | FAIL |
Mark Moncarr
|
|
|
Dedicated well circuit needs inspected for a separate service to be installed. There is an existing service at the home. This is a second service location for the well using the same physical street address. Dustin ###-#### Phone #: ###-#### Inspection requested via web by Paula Gratiot 1. Expansion coupling upside down. 2. Need ground rod driven. Lugs on transformer are for lifting purposes for IDP, it is not a lug for a GEC although we have been allowing termination for temp poles.
|