Final | 7/16/2020 | 7/17/2020 | 7/17/2020 | A | PASS |
James Ady
|
|
|
There will be guys there working. If not there is a key in the pipe between the buildings. If you have any questions please feel free to contact Sam ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Corrections made final ok
|
Final | 7/14/2020 | 7/15/2020 | 7/15/2020 | A | FAIL |
Rock A. Hudson
|
|
|
There is a key in the pipe in between the buildings. Call Clay ###-#### with any questions. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan 110.22- Furnace disconnecting means shall be labelled. 342.30- IMC service riser shall be secured with in 3' of meter base. 408.4- Circuit directories shall be complete for house and garage. 440.6- Ac overcurrent protection shall not exceed value on name plate. 15 amp max 20 amp installed.
|
Electrical Rough-In | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Eric Story
|
|
|
It is open. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Correction fixed Rough-in ok to cover
|
Permanent Service | 5/4/2020 | 5/4/2020 | 5/4/2020 | P | PASS |
Eric Story
|
|
|
It is open. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan p/s u/g n ok
|
Rough-In Permanent Service | 4/30/2020 | 5/1/2020 | 5/1/2020 | A | FAIL |
Rock A. Hudson
|
|
|
It is open. If you have any questions please feel free to contact Chaz ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan 110.3- As per manufacturers instructions, 80 to 125 amp breakers shall be installed at lowest position on bus bar, space 125 amp breaker is installed is rated at 50 amp max. On main level living room recessed can cover shall be completely installed. 210,52(A)- A receptacle outlet shall be located with in 6' of basement bathroom door. 250.32(A)- A grounding electrode system shall be installed at seperate structures, house.
|
Electrical Rough-In | 4/8/2020 | 4/9/2020 | 4/9/2020 | A | PASS |
Eric Story
|
|
|
This is for the underground. If you have any questions please feel free to contact Clay ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan U/G ok to cover
|