Final | 5/27/2020 | 5/28/2020 | 5/28/2020 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Schaffer Correction made final ok
|
Final | 5/26/2020 | 5/27/2020 | 5/27/2020 | A | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Schaffer All metal within 5ft of waters edge shall be bonded to tub equipment(Down spout only) Light is GFCI protected. Hot tub needs filled with water prior to final in order to test Function of GFCI breaker.
|
Electrical Rough-In | 5/11/2020 | 5/12/2020 | 5/12/2020 | A | PASS |
James Ady
|
|
|
Inspect underground conduit Phone #: ###-#### Inspection requested via web by Ryan Schaffer Underground from service to Disconnect and from disconnect to tub ok to cover
|