Permit Information
Permit NumberELE97-00430
StatusExpired
Name DANNY BRUNNER
Site Address 245 S CAPITOL BLVD
Project NameWESTCOAST HOTEL
Customer Number 
ePlanReview 
Description
ELECTRICAL SHELL AND CORE FOR ENTIRE BUILDING/$2,498,000.00/INITIAL CERT OF VALUE. AJB 6/15/98-ESTIMATED CONTRACT VALUE 4,693,776.00 LH
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final7/14/19987/14/19987/14/1998APASS
DetailsMarv Burrus
CONFERENCE FOR REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY.
INSP - Final6/25/19986/25/19986/25/1998PPASS
DetailsJack Frank
06/25/98 315 - ###-####/ ###-#### cel tower please call before going..tr ok
INSP - Final6/23/19986/24/19986/24/1998APART
DetailsJack Frank
06/24/98 315 - DAve ###-####..trans jms.. ok
INSP - Electrical Rough-In4/24/19984/24/19984/24/1998PPART
DetailsMarv Burrus
04/24/98 403 - ceiling grid on the 4, 5, and 14, 15 and 16th floor-mike
INSP - Electrical Rough-In4/14/19984/14/19984/14/1998PPART
DetailsMarv Burrus
04/14/98 403 - Scheduled by Hello!. Contact phone is [4242271]. SMOKE DETECTOR INSTALLATION IN UNITS; 1602, 1603, 1604, 1605, 1606, & 16 ALSO, R/I OF ELEVATOR LOBBY'S ON 4TH, 5TH, AND 15TH FLOORS.
INSP - Electrical Rough-In4/10/19984/10/19984/10/1998PPASS
DetailsMarv Burrus
REINSPECTION MAX ###-#### 4TH FLOOR ELEVATOR `A' LOBBY-CEILING.
INSP - Final3/26/19983/26/19983/26/1998APART
DetailsMarv Burrus
CONFERENCE; DISCUSSED REQUIREMENTS NEEDED BY CONTRACTORS FOR CERTIFICATE OF OCCUPANCY.
INSP - Electrical Rough-In3/19/19983/20/19983/20/1998APART
DetailsMarv Burrus
03/19/98 403 - Scheduled by Hello!. Contact phone is [4242271]. SUITE 325 (CEILING COVER); SUITES 338 AND 339 (FINAL).
INSP - Permanent service3/18/19983/18/19983/18/1998 PASS
DetailsMarv Burrus
/ / 403 - SERVICE DISCONNECT AND METER BANKS FOR FUTURE TENNANTS OF CO
INSP - Electrical Rough-In3/16/19983/16/19983/16/1998PPART
DetailsMarv Burrus
03/16/98 403 - Scheduled by Hello!. Contact phone is [4242271]. 15TH FLOOR; SPEAKERS IN CEILING R/I/.
INSP - Electrical Rough-In3/10/19983/10/19983/11/1998PPART
DetailsMarv Burrus
03/10/98 403 - 3RD FLOOR CEILING AND PARTIAL FINAL ON WALLS--DAVE 424-22
INSP - Electrical Rough-In3/4/19983/4/19983/4/1998PPASS
DetailsMarv Burrus
03/04/98 403 - 3rd floor ceiling walls dave ###-#### MEETING ROOM.
INSP - Final2/26/19982/27/19982/27/1998APART
DetailsMarv Burrus
02/27/98 403 - PARTIAL 13TH FLOOR--DAVE ###-#### ROOMS AND CORIDOOR.
INSP - Electrical Rough-In2/18/19982/19/19982/19/1998APART
DetailsMarv Burrus
02/18/98 403 - 14TH FLOOR-2ND FLOOR CEILING-DAVE ###-####
INSP - Electrical Rough-In2/13/19982/13/19982/13/1998PPART
DetailsJack Frank
02/13/98 315 - PINHOUSE SERVICE P/S 18TH FLOOR..trans by JMS.. still needs to grd xformer and do bonding with 3/0 copper
INSP - Final2/10/19982/10/19982/10/1998PPASS
DetailsMarv Burrus
INQUIRED ABOUT FUTURE INSPECTIONS. CONFERENCE.
INSP - Final2/2/19982/3/19982/3/1998APART
DetailsMarv Burrus
02/02/98 403 - lobby level partial final.intermediate level part final. second and third floor partial final. dave ###-####
INSP - Electrical Rough-In1/30/19982/2/19982/2/1998ACANC
DetailsMarv Burrus
02/01/98 403 - lobby level interm. lever part. final ###-#### BY CONCTRACTOR, WILL RESCHECDULE.
ELE - Partial final1/30/19981/30/19981/30/1998PPART
DetailsMarv Burrus
EVENT LEVEL.
INSP - Ele Rough-In/Perm Svc1/29/19981/30/19981/30/1998APASS
DetailsMarv Burrus
01/29/98 403 - dave ###-####. 15TH FLOOR, CORIDOOR ELE R/I.
INSP - Electrical Rough-In1/22/19981/23/19981/23/1998APASS
DetailsMarv Burrus
01/22/98 403 - dave ###-#### 2ND floor rough wall, MEETING ROOMS.
INSP - Electrical Rough-In1/22/19981/22/19981/22/1998PPASS
DetailsMarv Burrus
01/22/98 403 - late pm ###-#### 14TH FLOOR CORIDOOR WALLS R/I.
INSP - Electrical Rough-In1/20/19981/21/19981/21/1998APART
DetailsMarv Burrus
01/20/98 403 - 13TH FLOOR EVENT LEVEL CEILING ###-####
INSP - Electrical Rough-In1/15/19981/16/19981/16/1998APART
DetailsMarv Burrus
01/15/98 403 - 13th floor Dave ###-#### N.E.-SIDE,ENTRY AND BATH CEILINGS.
INSP - Conference1/15/19981/15/19981/15/1998PPASS
DetailsMarv Burrus
DISCUSSED AREAS NEEDED FOR FINALING.
INSP - Final1/13/19981/14/19981/14/1998PPART
DetailsMarv Burrus
01/13/98 403 - ###-####-mABIE
INSP - Miscellaneous1/13/19981/13/19981/13/1998 PASS
DetailsMarv Burrus
/ / 403 - DISCUSSED REMAINING INSPECTIONS NECESSARY FOR FINAL OF BANK OF AMERICA CENTER.
INSP - Final1/9/19981/12/19981/12/1998APART
DetailsMarv Burrus
01/11/98 403 - 12th floor 3rd floor meeting room ceiling and floors 6 th ceilings. ###-#### Dave
INSP - Conference1/6/19981/6/19981/6/1998 PASS
DetailsMarv Burrus
/ / 403 - DISCUSSED CLEARANCE ISSUES FOR METERING AND DISCONNECTS OF SUITES.
INSP - Electrical Rough-In1/6/19981/6/19981/6/1998PPASS
DetailsMarv Burrus
01/06/98 403 - 2nd floor ceiling (LIQUOR ROOM).
INSP - Final1/6/19981/6/19981/6/1998 PASS
DetailsMarv Burrus
01/06/98 403 - 11th floor rooms.
INSP - Final12/31/19971/2/19981/5/1998APASS
DetailsMarv Burrus
01/02/98 403 - 10th floor
INSP - Temporary occupancy12/31/199712/31/199712/31/1997APASS
DetailsMarv Burrus
TEMP/OCCUP. FOR FIRST 9 FLOORS OF T.C.O.
INSP - Temporary occupancy12/31/199712/31/199712/31/1997APASS
DetailsMarv Burrus
TEMP/OCCUP. FOR FIRST 9 FLOORS OF T.C.O.
INSP - Miscellaneous12/30/199712/30/199712/30/1997PFAIL
DetailsMarv Burrus
TESTED POWER SUPPLY TO KITCHEN HOOD FAN/OPERATION. ALARM CONTROL SHALL BE REPROGRAMED.
ELE - Partial final12/29/199712/29/199712/29/1997PPART
DetailsMarv Burrus
12/29/97 403 - LOBBY--8TH AND 9TH FLOOR--HOOD EXHAUST
ELE - Partial final12/23/199712/24/199712/24/1997APART
DetailsMarv Burrus
12/23/97 403 - ROOMS 6 & 7--LOBBY AND BALLROOM
INSP - Electrical Rough-In12/23/199712/24/199712/24/1997APART
DetailsMarv Burrus
12/23/97 403 - LOBBY LEVEL CEILING
INSP - Electrical Rough-In12/23/199712/23/199712/23/1997PPART
DetailsMarv Burrus
12/23/97 403 - STAIRWELL ONE, 4 LEVELS.
INSP - Conference12/22/199712/22/199712/22/1997APASS
DetailsMarv Burrus
discussed requirements for code violations for job final.
INSP - Electrical Rough-In12/22/199712/22/199712/22/1997PPASS
DetailsMarv Burrus
12/22/97 403 - ball room, EVENT LEVEL ALARM AND STROBE SIGNAL TESTING.
INSP - Conference12/19/199712/19/199712/19/1997 PASS
DetailsMarv Burrus
/ / 403 - PROFIT MEETING.
INSP - Electrical Rough-In12/18/199712/19/199712/19/1997APASS
DetailsMarv Burrus
12/18/97 403 - 2ND FLOOR CEILING/KITCHEN/2ND FLOOR PANELS
INSP - Electrical Rough-In12/17/199712/18/199712/18/1997APASS
DetailsMarv Burrus
12/17/97 403 - LOBBY CEILING (VALET PARKING CENTER). DISCONNECTS IN LOBBY NEAR RAMP. WALK-IN COOLERS(TOP).
INSP - Electrical Rough-In12/16/199712/16/199712/16/1997PPART
DetailsMarv Burrus
12/16/97 403 - 13TH FLOOR, LOBBY AREA(CEILING AREA), VALET BOOTH.
INSP - Electrical Rough-In12/15/199712/15/199712/15/1997PPART
DetailsMarv Burrus
12/15/97 403 - 13TH FLOOR, NORTH SIDE ROOMS.
INSP - Electrical Rough-In12/15/199712/15/199712/15/1997PCANC
DetailsMarv Burrus
12/15/97 403 - PORTA COCHERE--PLACE WHERE THE CAR DRIVES UP BY CONTRACTOR, WILL RESCHEDULE.
INSP - Electrical Rough-In12/10/199712/10/199712/10/1997PPART
DetailsMarv Burrus
12/10/97 403 - LOBBY; HEAT TAPE INSTALLATION.
INSP - Electrical Rough-In12/9/199712/9/199712/9/1997PPART
DetailsMarv Burrus
LOBBY/ HI MARV! WALL R/I NEAR BACK-DOCK.
INSP - Ele Rough-In/Perm Svc12/3/199712/4/199712/4/1997APART
DetailsMarv Burrus
12/03/97 403 - Scheduled by Hello! on 12/03/97 at 16:35:09. CEILING-GRAND STAIRWAY. NO PERM/SVC REQUESTED.
INSP - Conference12/3/199712/3/199712/3/1997 PASS
DetailsMarv Burrus
/ / 403 - CHECKED ON CLEARANCES OF SERVIEC PANELS ON DIFFERENT FLOOR L
INSP - Conference12/2/199712/2/199712/2/1997 PASS
DetailsMarv Burrus
/ / 403 - "PROFIT" MEETING WITH BOISE CITY INSPECTORS, PCL CONSTRUCTIO INVESTORS TO DISCUSS REQUIREMENTS FOR FINAL C.0.
INSP - Electrical Rough-In12/1/199712/2/199712/2/1997APART
DetailsMarv Burrus
12/01/97 403 - LOBBY LEVEL FALSE COLUMN ELE R/I.
INSP - Ele Rough-In/Perm Svc11/25/199711/26/199711/26/1997PPASS
DetailsMarv Burrus
11/26/97 403 - Scheduled by Hello! on 11/25/97 at 12:56:44. BALLROOM: CEILING COVER. 11TH FLOOR: CEILING COVER. LOBBY LEVEL: ELEVA WALLS.
INSP - Ele Rough-In/Perm Svc11/20/199711/21/199711/21/1997PPART
DetailsJack Frank
11/21/97 315 - Scheduled by Hello! on 11/20/97 at 16:15:12...I gave this tried to cancel, but couldn't... 09 ok jf
INSP - Electrical Rough-In11/18/199711/18/199711/18/1997PPART
DetailsMarv Burrus
11/18/97 403 - 12TH FLOOR.
INSP - Electrical Rough-In11/14/199711/17/199711/17/1997PPART
DetailsMarv Burrus
11/17/97 403 - LOBBY AND, 9TH FLOOR CEILING.
INSP - Electrical Rough-In11/14/199711/14/199711/14/1997PNR
DetailsMarv Burrus
11/14/97 403 - 9TH FLOOR. NOT READY, WILL RESCHEDULE. CEILING.
INSP - Electrical Rough-In11/10/199711/7/199711/7/1997PPASS
DetailsJack Frank
r/i on 6, 7, 8 & 11 floors...sent to 315 by 324 @ 3:30 pm...JMS
INSP - Electrical Rough-In11/3/199711/4/199711/4/1997APASS
DetailsMarv Burrus
11/03/97 403 - LATE AM/ 10TH FLOOR. CORIDOOR AND UNIT WALLS R/I, NOT BA HI MARV!
INSP - Electrical Rough-In10/30/199710/31/199710/31/1997APART
DetailsMarv Burrus
10/30/97 403 - 9TH FLOOR, 7TH FLOOR, AND EVENT LEVEL, CALL ###-#### MABI
INSP - Electrical Rough-In10/29/199710/30/199710/30/1997ACANC
DetailsMarv Burrus
10/29/97 403 - 9TH FLOOR WILL RESCHEDULE.
INSP - Electrical Rough-In10/27/199710/27/199710/27/1997PPART
DetailsMarv Burrus
10/27/97 403 - 8TH FLOOR AND 6TH FLOOR CEILINGS
INSP - Electrical Rough-In10/22/199710/23/199710/23/1997PPART
DetailsMarv Burrus
10/23/97 403 - 8TH FLOOR--STARIWELL--LATE PM PLEASE--
INSP - Permanent service10/22/199710/23/199710/23/1997PCANC
DetailsMarv Burrus
10/23/97 403 - INSPECTED ON 10-22-97.
INSP - Permanent service10/22/199710/22/199710/22/1997APASS
DetailsMarv Burrus
INSPECTED PANELBOARDS ON #1OTH, 11TH, 12TH, AND 13TH FLOORS.
INSP - Electrical Rough-In10/20/199710/21/199710/20/1997APART
DetailsMarv Burrus
SASCO, SHELL & CORE/ BLD96-0710 7TH FLOOR CORIDOOR; & LOBBY LEVEL KITCHEN R/I.
INSP - Electrical Rough-In10/16/199710/16/199710/16/1997PPART
DetailsMarv Burrus
10/16/97 403 - 7TH FLOOR NORTHSIDE, WALLS ONLY.
INSP - Electrical Rough-In10/15/199710/15/199710/15/1997PPASS
DetailsMarv Burrus
10/15/97 403 - marv. this one was missed on 10-9-97 im not sure what hap 7TH FLOOR WEST WALLS R/I.
INSP - Electrical Rough-In10/8/199710/8/199710/8/1997PPASS
DetailsMarv Burrus
10/08/97 403 - IF POSSIBLE 1:00 3RD FLOOR EXHIBITION AREA.
INSP - Permanent service10/7/199710/8/199710/8/1997APASS
DetailsMarv Burrus
PANEL BOARDS FOR THE 3RD AND 6TH FLOOR
INSP - Electrical Rough-In10/7/199710/7/199710/7/1997APASS
DetailsMarv Burrus
2ND FLOOR
INSP - Electrical Rough-In10/1/199710/2/199710/2/1997PPART
DetailsMarv Burrus
10/02/97 403 - 6TH-PLUS THE CANOPY LIGHTS
INSP - Electrical Rough-In10/1/199710/1/199710/1/1997 PART
DetailsMarv Burrus
/ / 403 - 6TH FLOOR & CANOPY LIGHTS.
INSP - Miscellaneous9/30/19979/30/19979/30/1997 PASS
DetailsMarv Burrus
/ / 403 - GENERATOR FULL-LOAD TEST.
INSP - Electrical Rough-In9/25/19979/26/19979/26/1997PFAIL
DetailsMarv Burrus
09/26/97 403 - GEN TEST AT 1 P.M. GENERATOR HAD PHASE TO GROUND (DIRECT SHORT), AT TEST.
INSP - Electrical Rough-In9/24/19979/24/19979/24/1997PPART
DetailsMarv Burrus
2ND FLOOR: PRE-FUNCTION AREA,ROOM# 215, COLUME. 3RD FLOOR: ROOM# 315.
INSP - Electrical Rough-In9/21/19979/19/19979/22/1997 PART
DetailsMarv Burrus
/ / 403 - TRANSFORMER AND PANEL (EVENT LEVEL).
INSP - Temporary occupancy9/18/19979/18/19979/18/1997PPASS
DetailsMarv Burrus
TEMP/OCC INSPECTION FOR SCHEDULED CONCERT.
INSP - Temporary occupancy9/18/19979/18/19979/18/1997PPASS
DetailsMarv Burrus
TEMP/OCC INSPECTION FOR SCHEDULED CONCERT.
INSP - Electrical Rough-In9/17/19979/17/19979/17/1997 PART
DetailsMarv Burrus
/ / 403 - LOBBY BATHROOMS, TRANSFORMERS 3RD FLOOR.
INSP - Conference9/15/19979/15/19979/15/1997APASS
DetailsMarv Burrus
DISCUSSED NECESSARY COMPLETIONS FOR TEMP/OCCUP FOR UPCOMING EVENT. ALSO, AREAS TO CORRECT CLEARANCE VIOLATIONS.
INSP - Electrical Rough-In9/15/19979/15/19979/15/1997PPASS
DetailsMarv Burrus
09/15/97 403 - 2nd floor-event level ceilings,3RD FLOOR-BATHROOMS CEILIN
INSP - Temporary occupancy9/10/19979/10/19979/10/1997PPASS
DetailsMarv Burrus
ONLY AREA FOR SCHEDULED EVENT.
INSP - Temporary occupancy9/10/19979/10/19979/10/1997PPASS
DetailsMarv Burrus
ONLY AREA FOR SCHEDULED EVENT.
INSP - Conference9/9/19979/9/19979/9/1997APASS
DetailsMarv Burrus
DISCUSSED CLEARANCES OF SERVICE PANELS.
INSP - Electrical Rough-In9/8/19979/8/19979/8/1997PPASS
DetailsMarv Burrus
3RD FLOOR , MECH. EQUIP PANEL BOARDS,
INSP - Electrical Rough-In9/5/19979/8/19979/5/1997PPASS
DetailsMarv Burrus
2ND FLOOR , PANELS, BALL ROOM WALL ROUGH-IN, MEN AND WOMENS BATHROOM CEILING, AND CORRIDOR,
INSP - Electrical Rough-In9/5/19979/8/19979/5/1997PPASS
DetailsMarv Burrus
PENTHOUSE, MCC, CHILLERS, COOLING TOWERM, WATER HEATER AND PANELS
INSP - Conference9/4/19979/5/19979/5/1997PPASS
DetailsMarv Burrus
AT 2:30 AS PER JIM SCHMER discussed needed code requirements for opening.
INSP - Conference9/4/19979/5/19979/5/1997PPASS
DetailsJim Schmer
2:30 PM
INSP - Conference9/4/19979/4/19979/4/1997APASS
DetailsJim Schmer
INSP - Hot Tubs/Spas8/28/19978/29/19978/29/1997APART
DetailsMarv Burrus
08/28/97 403 - 5TH FLOOR JACZ/POOL BONDING; 3RD FLOOR ELEVATOR SHAFT WAL
INSP - Conference8/28/19978/28/19978/28/1997APASS
DetailsMarv Burrus
DISCUSSED CODE VIOLATIONS OF CLEARANCES ABOUT SERVICE DISCONNECTS.
INSP - Electrical Rough-In8/27/19978/28/19978/28/1997APART
DetailsMarv Burrus
08/27/97 403 - EVENT LEVEL. ELE-R/I FOR 5 BATHROOM LITES.
INSP - Electrical Rough-In8/25/19978/26/19978/26/1997APART
DetailsMarv Burrus
can. lights, 2nd and 3rd fl part. r/i switch gear, stair case
INSP - Electrical Rough-In8/21/19978/22/19978/22/1997PPASS
DetailsMarv Burrus
08/22/97 403 - 2nd floor r/partial walls partial panel different level
INSP - Conference8/22/19978/21/19978/21/1997APASS
DetailsMarv Burrus
MEETING WITH INSPECTIORS AND ENGINEERS OF WEST COAST HOTEL.
INSP - Electrical Rough-In8/18/19978/18/19978/18/1997 PART
DetailsMarv Burrus
08/18/97 403 - 3RD FLOOR. BATHROOM WALLS, ROOMS# 305&306; ELEVATOR "E"
INSP - Electrical Rough-In8/13/19978/14/19978/14/1997PPART
DetailsMarv Burrus
08/14/97 403 - stairwell#2, 2nd floor, event level, and the intermediate
INSP - Electrical Rough-In8/8/19978/11/19978/11/1997APART
DetailsMarv Burrus
08/10/97 403 - pool penthouse and intermediate wall lobby r/i LOBBY AREA NOT READY, WILL RESCHEDULE.
INSP - Electrical Rough-In8/7/19978/8/19978/10/1997PPART
DetailsMarv Burrus
08/07/97 403 - PARTIAL ROUGH-IN 2ND FLOOR 3RD FLOOR AND LOBBY LEVEL. LOBBY NOT READY AT THIS TIME...MB
INSP - Permanent service8/5/19978/6/19978/6/1997PPASS
DetailsMarv Burrus
08/06/97 403 - MAIN SWITCH-GEAR PERM/SVC INSPECTION.
INSP - Electrical Rough-In8/4/19978/5/19978/5/1997APASS
DetailsMarv Burrus
08/04/97 403 - rough-in on the walls. 3RD FLOOR FLOOR INTERMEDIATE LEVEL LID CEILING IN ROOMS EXCEPT ROOMS # 221, 215, 206, 207, 225, 226, 227, &
INSP - Permanent service7/31/19978/4/19978/4/1997ACANC
DetailsMarv Burrus
08/03/97 403 - REQUEST BY CONTRACTOR...
INSP - Electrical Rough-In7/31/19978/1/19978/1/1997PPART
DetailsMarv Burrus
08/01/97 403 - PARTIAL WALL INSPECTION. CORRIDOOR INNERWALL 2ND FLOOR; CORRIDOOR SMALL INNER WALL 3RD FLOOR.
INSP - Conference7/31/19977/31/19977/31/1997 PASS
DetailsMarv Burrus
/ / 403 - DISCUSSED FIRE WALL VIOO DISCUSSED FIRE WALL VIOLATIONS, AND ELECTRICAL MATERIAL INSTALLED WITHOU INSPECTIONS.
INSP - Conference7/31/19977/31/19977/31/1997APASS
DetailsJim Schmer
All supervisors and inspectors, cover problems on inspections.
INSP - Permanent service7/30/19977/31/19977/31/1997ACANC
DetailsMarv Burrus
07/30/97 403 - WILL RESCHEDULE AT LATER DATE.
INSP - Conference7/30/19977/30/19977/30/1997PPASS
DetailsJack Frank
01 ok jf was with MBurrus 01 on 53 in basement
INSP - Conference7/30/19977/30/19977/30/1997 PASS
DetailsMarv Burrus
/ / 403 - DISCUSSED CODE REQUIREMENTS FOR MAIN SERVICE SWITCH GEAR.
INSP - Electrical Rough-In7/24/19977/25/19977/25/1997APASS
DetailsMarv Burrus
07/24/97 403 - LOBBY AREA, OUTER WALL...MB
INSP - Electrical Rough-In7/17/19977/18/19977/18/1997APASS
DetailsMarv Burrus
07/17/97 403 - 3rd floor. SOUTHEAST INTERIOR WALLS...MB
INSP - Electrical Rough-In7/15/19977/16/19977/16/1997APART
DetailsMarv Burrus
07/15/97 403 - r/i on the event level. 4 SMALL WALLS ONLY...MB
INSP - Electrical Rough-In7/2/19977/2/19977/2/1997PPASS
DetailsJoe Ray
07/02/97 404 - need at 2 o'clock if not could you do it thur.a.m. 2nd fl
INSP - Electrical Rough-In6/11/19976/12/19976/12/1997APART
DetailsMarv Burrus
3 RD FLOOR, INNER WALLS. 2ND FLOOR, INNER WALLS...MB
INSP - Electrical Rough-In5/27/19975/28/19975/28/1997APART
DetailsJack Frank
05/28/97 315 - 2ND FLOOR 09 ok jf partial walls
INSP - Electrical Rough-In5/2/19975/5/19975/5/1997APART
DetailsMarv Burrus
05/04/97 403 - FIRE ALARM & EXIT LIGHTS IN LOBBY AREA; RECEPTICLES IN EV
INSP - Electrical Rough-In4/21/19974/21/19974/22/1997PPART
DetailsMarv Burrus
04/21/97 403 - wall cover EVENT LEVEL CENTER WALLS, R/I...MB
INSP - Electrical Rough-In4/3/19974/4/19974/4/1997APART
DetailsMarv Burrus
wall rough-in EVENT SECTION HALL CORRIDOR; FIRST FLOOR EXIT CIRCUITS.