Random Inspection | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PASS |
Bill VanDegrift
|
|
|
|
Site Final | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | PASS |
Bill VanDegrift
|
|
|
|
Tracking Control | 4/28/2006 | 4/28/2006 | 4/28/2006 | P | CANC |
Aimee Hughes
|
|
|
|
Site Preparation | 12/9/2005 | 12/16/2005 | 12/19/2005 | P | PART |
Steven Webb
|
|
|
|
BMP Violation | 11/29/2005 | 12/8/2005 | 12/9/2005 | P | PART |
Steven Webb
|
|
|
|
Conference | 11/28/2005 | 11/29/2005 | 11/29/2005 | P | PART |
Steven Webb
|
|
|
Meet Ms Labrie on project site at 1:30 pm. Some additional corrections on the project, other items added which are needed on project site.
|
BMP Violation | 11/28/2005 | 11/28/2005 | 11/28/2005 | P | PASS |
Steven Webb
|
|
|
Access controls behind sidewalk are in place, (fence). Continue to keep in place throughout construction project. Also, the construction entrance is installed. Maintain as needed. Sweep daily or as needed. Will follow up.
|
Tracking Control | 11/2/2005 | 11/4/2005 | 11/7/2005 | A | PASS |
Aimee Hughes
|
|
|
Top dressing has been added to construction entrance. Access control will be completed as soon as top soil is delivered.
|
Tracking Control | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | PART |
Steven Webb
|
|
|
Top dressing is needed on construction entrance. Access control (fence) needs to be installed behind sidewalk, east of existing cons. entrance. Informed RP. Will follow up.
|
Site Preparation | 9/14/2005 | 9/19/2005 | 9/19/2005 | P | PASS |
Steven Webb
|
|
|
follow up inspection: Correction ok but sign still needs to be moved to main entrance and better access control--fence. Sweep daily or as needed.
|
Site Preparation | 9/14/2005 | 9/14/2005 | 9/14/2005 | P | FAIL |
Steven Webb
|
|
|
Correction notice posted on site; complete all items by the end of the weekend or a storp work can be issued. Will follow up the afternoon of 9/19/05.
|
Site Preparation | 9/6/2005 | 9/6/2005 | 9/6/2005 | | DONE |
|
|
|
Received 48 hour notice to start construction.
|