General Inspection | 5/27/2011 | 5/27/2011 | 5/27/2011 | | DONE |
Steven Webb
|
|
|
Permit doc-finaled.
|
DOC - Permit Finaled | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | PASS |
Steven Webb
|
|
|
Site development achieved final stabilization. NOT is filed as well.
|
General Inspection | 5/12/2011 | 5/12/2011 | 5/12/2011 | | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
General Inspection | 4/27/2011 | 4/27/2011 | 4/27/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | | PASS |
Steven Webb
|
|
|
No change but not ready to final.
|
General Inspection | 3/18/2011 | 3/18/2011 | 3/18/2011 | | PART |
Steven Webb
|
|
|
Misc debris appears to have been dumped but no construction activities is occurring. No apparent problems observed.
|
General Inspection | 3/3/2011 | 3/3/2011 | 3/3/2011 | | PASS |
Steven Webb
|
|
|
No change from last inspection, no activity noticed and no problems observed.
|
General Inspection | 2/16/2011 | 2/16/2011 | 2/16/2011 | | PASS |
Steven Webb
|
|
|
No changes from last inspection, no problems observed.
|
General Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/17/2011 | 1/17/2011 | 1/18/2011 | | CANC |
Steven Webb
|
|
|
holiday
|
General Inspection | 12/31/2010 | 12/31/2010 | 1/3/2011 | | CANC |
Steven Webb
|
|
|
HOLIDAY
|
General Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | | PASS |
Steven Webb
|
|
|
Sign posted, misc areas have been sodded, (common areas) and other areas have natural vegetation. Minimal areas are denuded. No problems observed.
|
General Inspection | 10/27/2010 | 10/27/2010 | 10/27/2010 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/27/2010 | 9/29/2010 | 9/29/2010 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Recolate the pile of pit run that was placed on the property to the east of his project area. He said that it will be taken care of by tomorrow afternoon. Will follow up on 9/29/2010am
|
General Inspection | 9/20/2010 | 9/20/2010 | 9/20/2010 | A | PASS |
Clint A Smith
|
|
|
Completing sidewalks and street repairs through out project. Site looks good. Will be providing a washout for concrete prior to the pour date.
|
Site Preparation | 6/11/2009 | 6/25/2009 | 6/25/2009 | A | NR |
Clint A Smith
|
|
|
Waiting on RP to contact us with a start date.
|
General Inspection | 7/29/2008 | 7/29/2008 | 7/30/2008 | P | PASS |
Steven Webb
|
|
|
No evidence of work being done.
|