Site Final | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PASS |
Clint A Smith
|
|
|
Site fully stabilized. Applied Hydro-seed to distubed area next to the Apple Bees where they used. Will pull d.i. protection at the drains on elder when they clean up today. CAS #460
|
Random Inspection | 3/25/2008 | 3/25/2008 | 3/25/2008 | P | PART |
Clint A Smith
|
|
|
Discussed with RP over the removal of siltfence along Elder street. Due to weather permitting, they might need to re-install a sediment BMP in place of the silt fence. Told the RP to keep an eye on that particular area. Will re-inspect tomorrow. CAS#460
|
Conference | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | DONE |
Clint A Smith
|
|
|
Discussedc with rp over future of project and what is going on with the dirt berm at the north east end outside of project. They will be stabilizing it. Will be notified before completed. CAS#460 ###-####
|
Random Inspection | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Clint A Smith
|
|
|
Site looking good. Installed more silt fence along the back of project by the construction trailer. Over all site is looking well. CAS#460 ###-####
|
Random Inspection | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Clint A Smith
|
|
|
Check up of project. They constructed trash bins that will be placed at the entry of the building. Also constructed a proper concrete washout for mortar and concrete.
|
Random Inspection | 2/13/2008 | 2/14/2008 | 2/14/2008 | A | PART |
Clint A Smith
|
|
|
Extending silt fence at the north west side of project. Also they will be addressing the berm of dirt at the back of project with hyro-seeding.
|
Site Preparation | 2/12/2008 | 2/13/2008 | 2/13/2008 | P | CANC |
Clint A Smith
|
|
|
check up on washout area and stockpile stabilization at back of project.
|
Random Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PART |
Clint A Smith
|
|
|
Driveway has been dressed with washed rock 2-3in rock. Permit isgn has been posted at the main entrance of project. Steve Meyers (Site super) went and recieved a temporary RP and will be taking the class on Wensday the 13th of Feb. 2008.
Discussed with RP that stock pile at the back of project must be stabilized since it has been dormit over 14 days. Washout pit needs to be dressed up with more plastic liner. Will re-inspect on 2/14/08 in the am.
|
Random Inspection | 2/8/2008 | 2/8/2008 | 2/8/2008 | P | CANC |
Clint A Smith
|
|
|
Wrote a Notice of Correction: 1. Construction Entrance 2. Post Signage at front of Main Entrance 3. Designated Parking area 4. Need to have a local "RP" for the day to day activity.
Will reinspect on 02/12/08 at 8:00am. If Notice is not address to the full, a "Stop Work Order" will be given.
Clint Smith #460 EC Inspector
|