Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC08-00279
StatusFinaled
Name KATHLEEN WRASPIR
Site Address 1139 N SHAMROCK AVE
Project Name 
Customer Number 
ePlanReview 
Description
homeowner RP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/14/200810/28/200810/28/2008APASS
DetailsJames Rogers
Front and rear landscaping in, site over 80% stabilized.
Site Preparation9/30/200810/14/200810/14/2008APASS
DetailsJames Rogers
Landscaping in progress
Random Inspection9/30/20089/30/20089/30/2008PPART
DetailsJames Rogers
Site cleanup in progress.
Random Inspection8/8/20088/8/20088/8/2008APART
DetailsMike Jordan
Needs to sweep sidewalk and driveway. Also needs to clean up construction debri from jobsite. c/n posted.
General Inspection8/4/20088/4/20088/4/2008PPASS
DetailsMike Jordan
sign was posted. All bmps still in place. site was clean.
Complaint Inspection8/4/20088/4/20088/4/2008PCANC
DetailsMike Jordan
General Inspection7/30/20087/30/20087/30/2008PPASS
DetailsMike Jordan
sign posted, bmps ok.
Random Inspection7/29/20087/29/20087/29/2008PPASS
DetailsMike Jordan
Sign was posted, all bmps in place, site clean.
BMP Violation7/14/20087/21/20087/21/2008APASS
DetailsClint A Smith
Trash container provided. All concrete has been cleaned up off of lot.
CAS
460
Site Preparation7/7/20087/14/20087/14/2008AFAIL
DetailsJames Rogers
A Notice of Violation issued.
Concrete washout on front of construction site is NOT APPROVED. Concrete washout has gone into canal and into gutter.

No concrete washout unless in an approved container. Each violation can be fine @ $300.00 each.

This is a second notice.
Site Preparation7/1/20087/8/20087/7/2008APASS
DetailsJames Rogers
See previous. Grading crew on site. Discussed with them keeping sidewalk and street swept.
BMP Violation6/23/20086/30/20087/1/2008APASS
DetailsJames Rogers
See previous notice. Discussed sidewalk sweeping and construction debris cleanup with Kathy at ###-####. She has provided a concrete washout container on site.
Site Preparation6/23/20086/23/20086/23/2008PFAIL
DetailsJames Rogers
Discussed 8-17 violations with RP, Kathy Wraspir.
1. BMP to be placed on S. side of property to prevent sediment from gettin onto property at 1117 Shamrock.
2. Concrete washout BMP to be provided on site.

Violations to be corrected by close of business on 6-27 or a stop work may be issued.
Site Preparation5/30/20086/2/20086/2/2008APART
DetailsBob Reichert
###-#### straw still in yard, note from rp saying they will come back and take care of today, also note stating yellow card being mailed
Site Preparation5/30/20085/30/20085/30/2008AFAIL
DetailsJack Frank
ph # ###-#### called talked with PP told her she needs bmps in place, card posted, filter for storm drain will check back 06-02-08