Site Final | 6/11/2009 | 6/12/2009 | 6/12/2009 | A | PASS |
Jim Sly
|
|
|
Landscape completed... BMPs removed...soil stabilized.
|
Site Final | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | PASS |
Jim Sly
|
|
|
|
Site Final | 6/10/2009 | 6/11/2009 | 6/11/2009 | A | CANC |
Jim Sly
|
|
|
Re-sched...
|
Site Final | 5/29/2009 | 6/10/2009 | 6/11/2009 | P | CANC |
Jim Sly
|
|
|
Dennis Phone ....follow up. Re-sched....
|
Site Final | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | NR |
Jim Sly
|
|
|
Dennis phone.....Still pouring concrete.....
|
Site Final | 5/28/2009 | 5/28/2009 | 5/28/2009 | P | NR |
Jim Sly
|
|
|
Dennis ###-####
|
Site Final | 5/28/2009 | 5/28/2009 | 5/28/2009 | A | CANC |
Jim Sly
|
|
|
|
Random Inspection | 5/20/2009 | 5/20/2009 | 5/20/2009 | P | PASS |
Jim Johnson
|
|
|
|
BMP Violation | 4/23/2009 | 4/27/2009 | 4/27/2009 | A | PASS |
Eric Strole
|
|
|
|
Random Inspection | 4/23/2009 | 4/23/2009 | 4/23/2009 | P | FAIL |
Eric Strole
|
|
|
left verbal correction with rp to clean all concrete spoils, dirt & debris off all hard surfaces & post esc sign by 4-24-09. will reinspect 4-27-09 am.
|
General Inspection | 1/12/2009 | 1/12/2009 | 1/12/2009 | P | PASS |
Pat Lass
|
|
|
called and reminded RP to clean street
|
General Inspection | 1/7/2009 | 1/7/2009 | 1/7/2009 | P | PASS |
Jack Frank
|
|
|
ok snow covered
|
Random Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | CANC |
Eric Strole
|
|
|
LOOOOOOOOOKS GOOD
|
General Inspection | 10/20/2008 | 10/22/2008 | 10/22/2008 | P | PART |
Eric Strole
|
|
|
waiting for underground electrical inspection, will have stock pile used for backfill at this time. rp said should be complete by weeks end.
|
General Inspection | 10/20/2008 | 10/20/2008 | 10/20/2008 | A | PART |
Eric Strole
|
|
|
left verbal correction with rp that if not going to have water & sewer backfilled by 10-22-08 that stockpile will have to be stablized from street.
|
General Inspection | 9/23/2008 | 9/30/2008 | 9/30/2008 | A | DONE |
Clint A Smith
|
|
|
Stock pile will be back filled into the footing tomorrow. Will re-inspect at the end of the day on 10/1/08
|
General Inspection | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | DONE |
Clint A Smith
|
|
|
Spoke with the RP to clean up all concrete spoil pile off of the site and place them into a pit or off site. Also will re-inspect on 9/30/08 to make sure that the stock pile was removed at the front of the project area.
|
Site Preparation | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | FAIL |
Jim Sly
|
|
|
Dennis McCoy Called Dennis......Need Conc washout pit and need excavated material off site or < 6 percent grade.
|