Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberESC08-00718
StatusFinaled
Name KENT OLSEN
Site Address 4328 W EDGEMONT ST
Project NameEDGEMONT RIM PLACE SUB
Customer Number 
ePlanReview 
Description
ESC includes development but does not include construction of any structures.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection ESC7/6/20107/6/20107/6/2010 DONE
DetailsSteven Webb
DOC - Permit Finaled7/6/20107/6/20107/6/2010PPASS
DetailsSteven Webb
General Inspection ESC6/21/20106/21/20106/21/2010 PASS
DetailsSteven Webb
No activity, not ready to final but is close.
General Inspection ESC6/4/20106/4/20106/4/2010 PASS
DetailsClint A Smith
No activity
General Inspection ESC5/20/20105/20/20105/20/2010 PASS
DetailsClint A Smith
no activity
General Inspection ESC5/5/20105/5/20105/5/2010 PASS
DetailsClint A Smith
General Inspection ESC4/20/20104/20/20104/20/2010 PASS
DetailsClint A Smith
No activity.
BMP Violation3/31/20104/5/20104/5/2010PPASS
DetailsClint A Smith
General Inspection ESC3/31/20103/31/20103/31/2010 FAIL
DetailsClint A Smith
Correction Notice(left a message for owner to contact the city over notice.)

1. Provide an RP with day to day control over Erocion and Sediment control issues that can be contacted.
2. Install an approved BMP for the storm drain inlet protection.
3. Install a sediment barrier BMP at the end of the road in the project at the NOrth West end where the disturbed soil meets with the pavement.
4. Post the ESC sign where it is visable from the street withh all of the proper information.
**Failure to comply will result in further enforcement. Will re-inspect on 4/5/10PM.
BMP Violation3/26/20093/27/20093/27/2009PPASS
DetailsClint A Smith
Issue has been corrected.
Complaint Inspection3/26/20093/26/20093/26/2009AFAIL
DetailsClint A Smith
Correction Notice: (Discussed with RP)
1. Determine and place the right manhole plate on the manhole stub out that is lower than grade.
2. Provide the proper internal and external protection to miniumize turbid run-off from entering the system.
Will re-inspect on 2/27/09PM.
Random Inspection1/21/20091/21/20091/21/2009APASS
DetailsDixie Fellows
job site shut down --site is clean
BMP Violation10/3/200810/7/200810/7/2008ADONE
DetailsClint A Smith
Moved to a Stop work order.
INSP - Stop Work Order10/7/200810/7/200810/7/2008PFAIL
DetailsClint A Smith
1. Clean up all sediment and debris out onto the street.
2. Protect all storm drains with approved protection.
3. Install an approved construction entrance.
No work inside of the project can occur until all issues have been dealt with, an inspection from me (Clint Smith) to pull the stop work order.
BMP Violation10/2/200810/3/200810/3/2008PFAIL
DetailsClint A Smith
Correction Notice:
1. PRotect 2 storm drain at the street where the entrance of the project is at. Will re-inspect on 10/7/08
General Inspection10/1/200810/2/200810/2/2008AFAIL
DetailsClint A Smith
left a message with the RP.
Correction Notice:
Clean up all sediment off of project areav into the street.
Protect the 2 storm drain inlets with approver protection.
Failure to comply will result in a Stop work order.
Will re-inspect on 10/3/08