Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC08-00776
StatusFinaled
Name NICK VOTH
Site Address 3366 E SWEETWATER DR
Project Name 
Customer Number 
ePlanReview 
Description
Clean up after fire and demo//Per SGW ok to transfer permit to Southern Idaho Builders RP is Nick Voth for construction of new home//9-9-09 LEG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/16/201012/16/201012/16/2010 DONE
DetailsSteven Webb
DOC - Permit Finaled12/16/201012/16/201012/16/2010PPASS
DetailsSteven Webb
Aging Inspection11/15/201011/15/201011/15/2010 FAIL
DetailsTroy James
landscaping still has not been completed, BLD has been finaled, no sign posted
General Inspection5/24/20105/24/20105/24/2010 DONE
DetailsClint A Smith
General Inspection4/22/20104/22/20104/22/2010 NR
DetailsSteven Webb
Site stabilization has not been completed.
Random Inspection3/19/20103/22/20103/22/2010PPART
DetailsJim Storey
wip
Site Final3/12/20103/12/20103/12/2010PNR
DetailsJim Storey
left open for home owner landscaping.
Random Inspection12/18/200912/18/200912/18/2009PPASS
DetailsJim Storey
Random Inspection12/9/200912/9/200912/9/2009APASS
DetailsJim Storey
General Inspection12/4/200912/4/200912/4/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection11/20/200911/20/200911/20/2009PPASS
DetailsTroy James
Random Inspection10/2/200910/2/200910/2/2009APASS
DetailsJim Storey
Random Inspection10/1/200910/1/200910/1/2009APASS
DetailsJim Storey
General Inspection9/23/20099/23/20099/23/2009PPASS
DetailsBob Reichert
looked ok street side
Site Preparation9/9/20099/14/20099/14/2009APASS
DetailsEric Strole
Follow up inspection
Site Preparation9/11/20099/11/20099/11/2009APASS
DetailsJim Storey
General Inspection9/10/20099/10/20099/10/2009PPASS
DetailsSteven Webb
Sign is posted. Instructed concrete worker to washout residual into on site washout area.
Site Preparation9/9/20099/9/20099/9/2009APART
DetailsSteven Webb
Contacted builder, (Nick, Southern Idaho Builders). Informed contractor to get the existing ESC Permit transfered into his name with a current certified RP. As well, post signage, install sediment barrier behind sidewalk for protection of stockpiled soils and use washout area for all concrete washout. Complete all activities by the end of the week, will re-inspect on Monday, Sept. 14th.
Random Inspection9/8/20099/8/20099/8/2009APASS
DetailsJim Storey
General Inspection9/23/20089/23/20089/23/2008PCANC
DetailsSteven Webb
Duplicate inspection
General Inspection9/23/20089/23/20089/23/2008PPASS
DetailsSteven Webb
Demo completed, hydro-seed sprayed and sediment barrier installed.
Random Inspection9/17/20089/17/20089/17/2008PPART
DetailsMike Jordan
ESC permit sign posted. After tree removal, remainder of lot will need to be waddeled. Also noted to excavating contractor that some sort of soil stabelization will need to be done on lot.
BMP Violation9/12/20089/16/20089/16/2008APASS
DetailsClint A Smith
Need to clean up the driveway on a daily basis. Perimeter control are inplace.
Site Preparation9/12/20089/12/20089/12/2008 FAIL
DetailsClint A Smith
Notice of Correction.
1. Need to install sediment bmp's a the back of lot at the hillside.
2. Need to install sediment bmp's at the stockpile in the drive way to prevent sediment from traveling into the gutterpan and into the storm drains. Must comply by 9/15/08 or further enforcement will be taken.
CAS
Will re-inspect on 9/16/08