Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC09-00211
StatusFinaled
Name SEAN CAFFERTY
Site Address 1700 E WARM SPRINGS AVE
Project Name 
Customer Number 
ePlanReview 
Description
6-24-10 Sean Cafferty will be taking over as the RP ///DLD
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection3/5/20123/5/20123/5/2012 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled3/5/20123/5/20123/5/2012PPASS
DetailsClint A Smith
Aging Inspection1/3/20121/3/20121/3/2012 PASS
DetailsClint A Smith
Aging Inspection10/31/201110/31/201110/31/2011 PASS
DetailsClint A Smith
Aging Inspection8/29/20118/29/20118/29/2011 PASS
DetailsClint A Smith
Aging Inspection6/27/20116/27/20116/27/2011 FAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment off of the sidewalks and maintain the sediment barriers along the back of sidewalk. Will follow up on 6/29/2011AM.
Aging Inspection4/25/20114/25/20114/25/2011 PASS
DetailsClint A Smith
Random Inspection2/22/20112/22/20112/22/2011PPASS
DetailsDave Hannah
General Inspection2/17/20112/17/20112/17/2011PPASS
DetailsDaryl Spivey
Aging Inspection2/16/20112/16/20112/17/2011 PASS
DetailsDaryl Spivey
Random Inspection11/16/201011/16/201011/16/2010PPASS
DetailsDave Hannah
Random Inspection10/25/201010/25/201010/25/2010PPASS
DetailsDave Hannah
Conference6/14/20106/21/20106/21/2010APASS
DetailsSteven Webb
Permit been transfer with new RP???? Met with Shawn, ageeement that prior to re-starting the project that the ESC permit will be transferred along with a certified RP.
Random Inspection6/14/20106/14/20106/14/2010PFAIL
DetailsSteven Webb
No sign posted, left one on site. Called
RP but the permit holder is no longer working on this project. After discussion with the parcel owner, T. Barber he informed me that a new contractor has been hired, Shawn Cavertity (sp). Shawn will need to transfer the ESC permit along with a certified RP or a stop work order will have to be issued. Will follow up.
Random Inspection4/1/20104/2/20104/2/2010APASS
DetailsDave Hannah
Random Inspection9/2/20099/2/20099/2/2009PPART
DetailsBob Reichert
looked ok
Random Inspection7/27/20097/27/20097/27/2009PPASS
DetailsJim Storey
BMP Violation6/26/20096/29/20096/29/2009APASS
DetailsClint A Smith
Complaint Inspection6/26/20096/26/20096/26/2009AFAIL
DetailsClint A Smith
Verbal to RP:
1.Clean up all sediment off of the road ways.
2. Containerize of remove pump ram that is located on the site.
3. Maintain exit at the North West end of project area.
Will re-inspect on 6/29/09 AM.
General Inspection6/1/20096/4/20096/4/2009APART
DetailsClint A Smith
All tracking cleaned up. Told RP to maintain construction entrance.
Site Preparation6/3/20096/3/20096/3/2009 CANC
DetailsClint A Smith
Inspector #420 inspected project today on a complaint.
Complaint Inspection6/3/20096/3/20096/3/2009PFAIL
DetailsSteven Webb
Complaint from ACHD regarding trackout, verbal correction to RP to install better working trackout controls and to have workers park offsite whenever possible.
Tracking Control6/3/20096/3/20096/3/2009PFAIL
DetailsSteven Webb
Needs better controls inside the fence to reduce trackout. Verbal to RP
Site Preparation6/1/20096/1/20096/1/2009AFAIL
DetailsClint A Smith
Verbal to IRP:
Post ESC sign. Make sure to line the washout pit due to the fact of soil type and ground water table. Will re-inspect on 6/4/09AM.