Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC09-00298
StatusFinaled
Name JOHN BLAKE
Site Address 3675 N JULLION ST
Project NameSummerwind
Customer Number 
ePlanReview 
Description
grading/drainage permit
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection4/19/20114/19/20114/19/2011 DONE
DetailsClint A Smith
Permit Finalled.
DOC - Permit Finaled4/19/20114/19/20114/19/2011PPASS
DetailsClint A Smith
DOC - Permit Finaled4/19/20114/19/20114/19/2011PPASS
DetailsClint A Smith
Aging Inspection2/16/20112/16/20112/17/2011 PASS
DetailsJim Johnson
building permit still open
Aging Inspection12/8/201012/8/201012/8/2010 PART
DetailsJim Johnson
building permit still open
Tracking Control7/20/20097/21/20097/21/2009APART
DetailsClint A Smith
Still need to put up the ESC sign.
Tracking Control7/17/20097/20/20097/20/2009PFAIL
DetailsClint A Smith
Discussed with RP over issues today. Will dealt with by the end of the day 7/20/09PM. Will re-inspect on 7/21/09AM.
Tracking Control7/17/20097/17/20097/17/2009PFAIL
DetailsClint A Smith
Message to RP:
Clean up all tracking off of project within the parking lot and onto Jollion ST.
Also re post ESC sign at the front of project. Will re-inspect on 7/20/09PM.
Random Inspection7/16/20097/16/20097/16/2009PPASS
DetailsClint A Smith
Random Inspection7/9/20097/9/20097/9/2009PPASS
DetailsClint A Smith
Site Preparation ESC6/17/20096/17/20096/17/2009 PART
DetailsClint A Smith
Went over the plan with Mike Hart with C&A Paving. Discussed with hi,m over the alterations to the ESC plan and eliminating certain BMP's where in is not threatening any water convences or protected areas. Told him that all storm drain inlets within the area of impact of the project need to be protected and documented on the ESC plan also by the RP of the project area. Will re-inspect on 6/19/09 PM.