General Inspection | 10/2/2009 | 10/30/2009 | 10/30/2009 | P | PART |
Steven Webb
|
|
|
Perform random check of slopes. Some signs of disturbance of the BFM due to animal traffiic, (deer).
|
Site Final | 10/12/2009 | 10/12/2009 | 10/13/2009 | P | PASS |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 10/12/2009 | 10/12/2009 | 10/12/2009 | P | PASS |
Steven Webb
|
|
|
|
General Inspection | 10/2/2009 | 10/2/2009 | 10/2/2009 | P | PASS |
Steven Webb
|
|
|
Lawn Co re-sprayed both slopes, (hydro-mulch, seed and tackifier). Adequate thicknes has been applied. Informed Dave B. (Boise Parks) that this application should be used for a test plot. We will leave this permit open until grass has been re-established, (summer of 2010). Note: barriers on the slope will remain in place as a permanent measure; NOT TO BE REMOVED.
|
General Inspection | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | PASS |
Steven Webb
|
|
|
video taken
|
General Inspection | 9/22/2009 | 9/23/2009 | 9/23/2009 | A | DONE |
Steven Webb
|
|
|
Video spraying application. Spraying has been started but will take some time due to small tank size.
|
General Inspection | 9/22/2009 | 9/22/2009 | 9/22/2009 | P | PART |
Steven Webb
|
|
|
Slopes are in need of an additional wattle towards at the toe prior to spraying with tackifier and mulch. Informed on site Parks person and this additional wattle will be in place prior to spraying. Will follow up.
|
Site Preparation ESC | 9/21/2009 | 9/21/2009 | 9/21/2009 | | CANC |
Clint A Smith
|
|
|
duplicate
|
Site Preparation | 9/17/2009 | 9/21/2009 | 9/21/2009 | A | PASS |
Clint A Smith
|
|
|
Prior to the seeding mulch mix application. The installation of of energy disapaters needed. All in all work is coming along good.
|
Conference | 9/15/2009 | 9/16/2009 | 9/17/2009 | A | FAIL |
Clint A Smith
|
|
|
Spoke Dave w/ parks and rec: Went over guidelines with the slope stabilization project. 1. Prior to the start of the slope project all bmps alond the drainiage need to be re-installed per manufactures specs. Will re-inspect on 9/21/09 Am
|
Conference | 9/15/2009 | 9/16/2009 | 9/16/2009 | A | DONE |
Steven Webb
|
|
|
Reviewed upcoming work site with Boise Parks. Contractor to re-install sediment barriers, they were improperly installed. After soil has been re-placed and sheepfooted, two sediment barriers need to be installed to break up the slope. Bonded Fiber Matrix (BFM) to be sprayed from numberous locations to stablized the bare slope. BFM is a combination of water, tackifier, mulch (high rate of application-2,000 lbs per acrea or greater) and seed mix. Inspector 460 will inspect site on Monday morning, 9/21/2009.
|