Permit Information
Permit NumberESC09-00681
StatusFinaled
Name STACIE IRISH
Site Address 8727 W FAIRVIEW AVE
Project NameDennis Dillon
Customer Number 
ePlanReview 
Description
Parking Lot
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection3/30/20113/30/20113/30/2011 DONE
DetailsClint A Smith
PErmit Finaled. Verical work is attached to ESC10-00456
DOC - Permit Finaled3/30/20113/30/20113/30/2011PPASS
DetailsClint A Smith
General Inspection1/24/20111/28/20111/28/2011APASS
DetailsClint A Smith
General Inspection1/24/20111/24/20111/24/2011 PART
DetailsClint A Smith
Verbal to RP:
Clean up all sediment and debris off of the parking lot. Will re-inspect on 1/24/2011 AM.
BMP Violation11/22/201011/22/201011/22/2010APART
DetailsClint A Smith
Site looks beter. Informed the RP that if activities create tracking that all treacked out material onto the hard surfaces must be cleaned up by the end of the day or prior to any storm events.
Tracking Control11/16/201011/19/201011/22/2010AFAIL
DetailsClint A Smith
On 11/19/2010 a correction notice was given for the following issues:

1. Clean up all sediment debris off of all hard surfaces.
2. Maintain all storm drain inlet protection when practiable
3. Place all trash debris within the container that is provided.
Failure to comply will result in a stop work order. This will be the last notice given. All further enforcement will result in stop work orders. Will re-inspect on 11/22/2010AM.
General Inspection11/16/201011/16/201011/16/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment and debris on all hard surfaces within the parking lot area. Will re-inspect on 11/19/2010am.
BMP Violation10/18/201010/22/201010/22/2010AFAIL
DetailsClint A Smith
Message to RP:
Clean up all sediment and debris off of all hard surfaces.
General Inspection ESC10/18/201010/18/201010/18/2010 FAIL
DetailsClint A Smith
Verbal to subsitute RP:
Protect the Field drain with the south west section of the south area where all soil is disturbed.
Where all dirt is disturbed to eliminate traffic on and off to the hard surfaces or to install a stabilized construction exit to reduce sediment tracking deposits onto the hardsurface of the parking lot. Will re-inspect on 10/22/2010am
General Inspection ESC8/17/20108/17/20108/17/2010 PART
DetailsClint A Smith
No activty.
General Inspection6/17/20106/17/20106/17/2010PPASS
DetailsSteven Webb
General Inspection ESC5/26/20105/26/20105/26/2010 CANC
DetailsSteven Webb
Tracking Control12/1/200912/7/200912/7/2009PPASS
DetailsClint A Smith
General Inspection12/1/200912/1/200912/1/2009PPART
DetailsBob Reichert
see 460 comments
General Inspection12/1/200912/1/200912/1/2009PFAIL
DetailsClint A Smith
Verbal to RP:
1. Clean up all hardsurface of all sediment and debris.
2. Install a stabilized construction exit off of disurbed area.
Will re-inspect on 12/7/09PM
BMP Violation11/17/200911/18/200911/18/2009PPASS
DetailsClint A Smith
Site Preparation11/17/200911/17/200911/17/2009 FAIL
DetailsClint A Smith
Verbal to RP:
1. Protect all storm drains within the parking lot area with approved storm drain inlet protection.
2. Install a stabilized construction exit per boise city standards field guide.
Will re-inspect on 11/18/09 PM.