Permit Information
Permit NumberESC09-00721
StatusFinaled
Name BRIAN D HETMER
Site Address 715 E PENNSYLVANIA ST
Project Name 
Customer Number 
ePlanReview 
Description
Permit includes sewer extension, sidewalk along ParkCenter & entrance.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection3/16/20113/16/20113/16/2011 DONE
DetailsSteven Webb
DOC - Permit Finaled3/16/20113/16/20113/16/2011PPASS
DetailsSteven Webb
Random Inspection8/31/20108/31/20108/31/2010PPART
DetailsBill VanDegrift
looks ok
BMP Violation3/11/20103/12/20103/12/2010PPASS
DetailsClint A Smith
General Inspection3/10/20103/11/20103/11/2010AFAIL
DetailsClint A Smith
Correction Notice: (Message to RP C/N posted at jobsite. )
1. Install a sediment barrier along the North East end of project area.
2. Install access controls to delineate access on and off of the project area.
3. Stabilize all disturbed soil that is or will be inactive for 14 days or greater.
* Failure to comply will result in further enforcement. Will re-inspect on 2/12/10 PM
General Inspection12/18/200912/18/200912/18/2009PPASS
DetailsBob Reichert
looked ok
General Inspection11/30/200912/1/200912/1/2009APASS
DetailsClint A Smith
sets have been taken to pump clean ground water to lwer the level from where they are excavating at. The turbid water will be directed to a sttling area prior to reaching the discharge point.
Complaint Inspection11/30/200911/30/200911/30/2009APART
DetailsClint A Smith
Went over detail regarding there dewatering operation and what they are required to meet prior to them discharging into the MS4 system on Parkcenter Blvd. Must not allow any turbid water into the storm drain where discharge point is located. Also must submit a dewatering plan to city of boise for review. Will re-inspect on 12/1/09AM.
Site Preparation ESC11/17/200911/17/200911/17/2009 CANC
DetailsSteven Webb
Site preparation inspection has been completed by inspector 460
General Inspection11/12/200911/16/200911/16/2009ACANC
DetailsClint A Smith
DEWATER
General Inspection11/13/200911/13/200911/13/2009PPASS
DetailsClint A Smith
No issue of dewatering that were a concern from ACHD.
Site Preparation11/12/200911/12/200911/12/2009APASS
DetailsClint A Smith
Told RP and also ther PD that prior to any dewater activies occuring that they must submit a dewatering plan to the city and recieve an approval on the plan prior to the activity occuring. Will re-inspect on 11/16/09AM.
INSP - Stop Work Order11/12/200911/12/200911/12/2009APASS
DetailsClint A Smith
Stop work order put in place due to working without a city ESC permit on 11/09/09. Permit has been issued. Stop work order has been lifted. All EC provisions are in place and actively working.