Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC10-00185
StatusFinaled
Name DAN BASTIAN
Site Address 2315 S APPLE ST
Project NameOil Can Henry's
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Preparation1/5/20111/5/20111/5/2011PCANC
DetailsClint A Smith
Wrong permit
Site Final8/23/20108/23/20108/23/2010PDONE
DetailsSteven Webb
Site stabilized
DOC - Permit Finaled8/23/20108/23/20108/23/2010PPASS
DetailsSteven Webb
Random Inspection8/10/20108/10/20108/10/2010APART
DetailsBill VanDegrift
looks ok just needs to sweep
BMP Violation7/8/20107/9/20107/9/2010ADONE
DetailsClint A Smith
went over with the issue of what occured with the dewatering and told them options of how they could have achieved compliance.
Random Inspection7/8/20107/8/20107/9/2010PFAIL
DetailsClint A Smith
Stopped the dewatwering operation into the valley gutter and recommended the RP to utilize a Sediment bag into the grassy area to the west of the project area. Will follow up tomorrow for clean up after the work is comppleted.
Random Inspection7/8/20107/8/20107/8/2010PPART
DetailsBill VanDegrift
talked to rp about dewatering sewer connection ditch.
Random Inspection7/6/20107/6/20107/6/2010PPASS
DetailsJim Storey
Random Inspection6/25/20106/25/20106/25/2010PPASS
DetailsJim Storey
General Inspection6/15/20106/15/20106/15/2010PPASS
DetailsSteven Webb
Dewatering terminated: Backfilling being performed.
Random Inspection6/8/20106/8/20106/8/2010PPASS
DetailsJim Storey
Complaint Inspection6/1/20106/1/20106/1/2010PPASS
DetailsSteven Webb
Walgreens parking lot contained no standing water. Water is being channeled along the curb to the nearest drop inlet. Water is clear. Contractor estimated another two weeks of de-watering.
Random Inspection5/26/20105/26/20105/26/2010APASS
DetailsJim Storey
Random Inspection5/18/20105/18/20105/18/2010PPASS
DetailsJim Storey
Random Inspection5/13/20105/13/20105/13/2010PPART
DetailsSteven Webb
Observed turbid discharge coming from the project. Informed RP that they need to address this discharge, they unhooled and ran the line into a water truck which would then return to the plant to discharge. Minor discharge due to compaction caused vibrations enough to cause fine material to enter the well point. Site is at the final elevation, de-watering will continue until the bottom & 1st floors and walls are poured and backfilled, if not the structure could "float" due to the water pressure.
Site Preparation5/4/20105/7/20105/7/2010APASS
DetailsSteven Webb
Sign is posted, de-watering is occurring and discharge is clear. Reviewed concrete washout procedures with contractor.
BMP Violation5/5/20105/6/20105/6/2010PPASS
DetailsTroy James
reinspect site prep
site prep ok, dewatering system working good
General Inspection5/6/20105/6/20105/6/2010APASS
DetailsClint A Smith
Dewatering is occuring from the well. No excavating has occured eyt. Wil re-inspect on 5/7/10am.
Conference5/4/20105/5/20105/5/2010ADONE
DetailsSteven Webb
10:00 on site: Met with contractor, RP, ACHD, Inspector 460 and 435. Reviewed de-watering procedures, including continuous dewatering. Ok to discharge into the storm drain drop inlet as long as the water is not turbid beyond standards. As well, reviewed trackout, debris, sign, etc. requirements. We will be following up.
Conference5/4/20105/5/20105/5/2010ADONE
DetailsClint A Smith
Refer inspector 420
Conference5/4/20105/5/20105/5/2010ADONE
DetailsTroy James
10:00 on site
Site Preparation5/4/20105/4/20105/5/2010 FAIL
DetailsTroy James
met with clint, steve and dan the rp on site to discuss dewatering and proper bmp's placement, rp needs to remove wattles or install them correctly for now, need to add more rock for tracking at curving to asphalt and post sign