General Inspection | 2/9/2011 | 2/9/2011 | 2/9/2011 | | DONE |
Clint A Smith
|
|
|
Permit Finalled.
|
Site Final | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 1/25/2011 | 1/25/2011 | 1/25/2011 | A | PART |
Steven Webb
|
|
|
send complaint insp to 420 per Clint S. Talked to RP and he said they would correct the old construction fencing . Informed complaintee of status and gave him the contractors name and telephone number. As well, gave complaintee my phone number and requested he call me for further discussions.
|
General Inspection ESC | 5/28/2010 | 5/28/2010 | 6/1/2010 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/29/2010 | 4/9/2010 | 4/9/2010 | A | PASS |
Steven Webb
|
|
|
Staging area for Ada County river stabilziation project. Trout Unlimited.
|
Site Preparation | 3/29/2010 | 3/29/2010 | 3/29/2010 | | NR |
Steven Webb
|
|
|
Trout Unlimited have not started project. Discussed staging area with Andy and summarized details to reduce tracking onto greenbelt. Andy will provide schedule information to ESC prior to start of work.
|