Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC10-00283
StatusFinaled
Name JULIO BERRELEZ
Site Address 1124 S VISTA AVE
Project NameJack in the Box
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final2/24/20112/25/20112/25/2011APASS
DetailsClint A Smith
General Inspection2/14/20112/14/20112/14/2011 DONE
DetailsBob Reichert
looked ok, not done yet
Random Inspection12/29/201012/29/201012/29/2010PPASS
DetailsJim Storey
Random Inspection12/22/201012/23/201012/23/2010APASS
DetailsJim Storey
Random Inspection12/20/201012/21/201012/21/2010APASS
DetailsJim Storey
Random Inspection12/20/201012/20/201012/20/2010PPASS
DetailsJim Storey
Random Inspection12/2/201012/3/201012/3/2010APASS
DetailsJim Storey
BMP Violation11/19/201011/22/201011/22/2010APASS
DetailsClint A Smith
BMP Violation11/19/201011/19/201011/19/2010PFAIL
DetailsClint A Smith
Verbal to RP:
1. Protect all storm drains that are not protected within project area and one on Vista. Will re-inspect on 11/22/2010AM.
General Inspection11/17/201011/17/201011/17/2010PPASS
DetailsBob Reichert
looked ok
Random Inspection11/5/201011/5/201011/5/2010PPASS
DetailsJim Storey
Random Inspection10/20/201010/20/201010/20/2010PPASS
DetailsJim Storey
Random Inspection10/18/201010/18/201010/18/2010PPASS
DetailsJim Storey
Random Inspection10/13/201010/14/201010/14/2010APASS
DetailsJim Storey
Random Inspection10/6/201010/6/201010/6/2010APASS
DetailsJim Storey
Random Inspection9/30/20109/30/20109/30/2010PPASS
DetailsJim Storey
Site Preparation9/2/20109/16/20109/16/2010APASS
DetailsClint A Smith
Random Inspection9/14/20109/14/20109/14/2010PPASS
DetailsJim Storey
Site Preparation9/10/20109/10/20109/10/2010PPART
DetailsSteven Webb
Verbal to RP, expand rock construction entrance and discussion regarding washout prior to placment of concrete took place. Signage is posted. RP has been changed in the system which reflects the person with day-to-day control.
BMP Violation9/9/20109/10/20109/10/2010APASS
DetailsClint A Smith
General Inspection9/7/20109/9/20109/9/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Re-install sediment barrier along Vista per manufacture specifications. Also add additional sediment barrier along Vista due slope and elevation of grade. Will reinspect on 9/10/10am.
Site Preparation9/7/20109/7/20109/7/2010PPART
DetailsClint A Smith
Spoke with contractor and RP over perimeter controls. Grade will be lower than the sidewalk. Also exturded curbing surrounds project area. Until it is all removed the contractor will keep a stock pile of sediment controls on site. Contractor will be suppling a water truck for dust control also. Will re-inspect on 9/9/10am
Site Preparation8/2/20109/2/20109/2/2010ACANC
DetailsClint A Smith
contact RP over start date.
Site Preparation8/2/20108/2/20108/2/2010 NR
DetailsClint A Smith
Perposed start date is the first of Sept.