Aging Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 | | PASS |
Tom Arcoraci
|
|
|
|
Site Final | 5/9/2011 | 5/9/2011 | 5/9/2011 | P | PASS |
Tom Arcoraci
|
|
|
completed
|
General Inspection | 3/9/2011 | 3/9/2011 | 3/9/2011 | | PASS |
Steven Webb
|
|
|
Conditions unchanged, site is inactive and stabilzation steps have been initialed. No problems observed.
|
General Inspection | 11/18/2010 | 1/7/2011 | 1/6/2011 | P | PASS |
Steven Webb
|
|
|
Site is temporary stable, frozen and no problems observed.
|
General Inspection | 10/28/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Steven Webb
|
|
|
Have ESC permit been transferred to Hawkins? Verify, if not call Aaron at Hawkins. ESC permit has been transferred, new certified RP attached to the permit. Grass has surfaced the ground surface. Should re-vegetate well in the spring time. Will follow up in 6 weeks.
|
General Inspection | 10/21/2010 | 10/29/2010 | 10/28/2010 | P | FAIL |
Steven Webb
|
|
|
Permit transferred?? Verify. Kristey came to City Hall to transfer the permit from Idea Demo to Hawkins but their were no certified RP for the transfer therefore the transfer could not be completed, intormed Kristey that a valid RP must be attached to any active ESC permit; transfer to be completed after a valid RP is able to be attached to the permit. Will nspect in three weeks not only the site but to see if the transfer has been done.
|
General Inspection | 10/19/2010 | 10/19/2010 | 10/19/2010 | P | PART |
Steven Webb
|
|
|
Contact Aaron Carrol: Overall site is ok, informed Hawkins Company that they need to have the ESC permit issued to Ideal Demo to them until the site has achieved final stabilization (70% growth). Monthly inspection and failures repaired (if observed) during the winter months. Aaron Carrol is the contact for Hawkins. Informed Bob Archibald that the BLD can be finalled and the bond released.
|
General Inspection | 10/19/2010 | 10/19/2010 | 10/19/2010 | P | CANC |
Steven Webb
|
|
|
Duplicate
|
Random Inspection | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | CANC |
Tom Arcoraci
|
|
|
|
Conference | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | DONE |
Steven Webb
|
|
|
10:30 Review ESC plan and discuss final stabilzation measures. Met with general contractor and owner, (Hawkins). Upon completeion of demo of structures & hard surfaces the site will be final graded and then contractor will file NOT (transfered to other filer (Hawkins). At this point the bond may be released (BLD finaled). The ESC will remain open until the ground has been seeded and 70% growth has been established. Informed Hawkins that inspections will need to continue to take place until the site is ready to close, (70% growth). Access controls (concrete barricades) are expected at all access points to reduce any traffic and trackout.
|
General Inspection | 9/9/2010 | 9/9/2010 | 9/9/2010 | P | PART |
Steven Webb
|
|
|
Overall things are in compliance, prior to removing ashpalt on north side, sediment barriers are needed until the site is stablized. Will meet with owners on Friday, 9/10 to review final stabilzation measures.
|
Random Inspection | 8/5/2010 | 8/5/2010 | 8/5/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign where visable from the street.
|
Site Preparation | 6/7/2010 | 6/11/2010 | 6/11/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 6/1/2010 | 6/7/2010 | 6/7/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 5/27/2010 | 6/1/2010 | 6/1/2010 | A | CANC |
Clint A Smith
|
|
|
Work has not begun. Will be starting on 6/7/10. Will inspect on that date.
|
Site Preparation | 5/13/2010 | 5/27/2010 | 5/27/2010 | A | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 5/13/2010 | 5/13/2010 | 5/13/2010 | | NR |
Clint A Smith
|
|
|
Will re-inspec t in two weeks.
|
Random Inspection | 5/3/2010 | 5/3/2010 | 5/3/2010 | P | FAIL |
Steven Webb
|
|
|
Module building are being removed from their pads, misc. trash and debris, (insulation, wood, etc) are uncontained. Informed RP that this debris needs to be taken care of, including removal from site, containerized). With a high wind warning in affect for this evening and night this material has the possibility to being blown throughout the neighborhood. Norman, ###-####.
|