Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC10-00362
StatusFinaled
Name STEVEN A JONES
Site Address 10681 W MCMILLAN RD
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/12/201112/12/201112/19/2011 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled12/19/201112/19/201112/19/2011PPASS
DetailsClint A Smith
General Inspection10/10/201110/10/201110/10/2011 CANC
DetailsAlan Hauser
General Inspection8/8/20118/8/20118/9/2011 PASS
DetailsJim Johnson
General Inspection6/6/20116/6/20116/8/2011 CANC
DetailsJim Johnson
General Inspection4/4/20114/4/20114/6/2011 PART
DetailsJim Johnson
talked to general contractor on site still working on stabilization of disturded area of project
Conference2/1/20112/1/20112/1/2011PCANC
DetailsClint A Smith
could not reach RP via phone and was noyt on site.
Site Final1/31/20111/31/20111/31/2011ANR
DetailsTom Arcoraci
BMP Violation12/15/201012/17/201012/17/2010APASS
DetailsClint A Smith
Tracking Control12/15/201012/15/201012/15/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Cleanup all hard surfaces within the project area. Must be comppleted by the end of day 0n 12/16/2010. Will re-inspect on 12/17/2010AM. Photo's taken of the project conditions prior to clean up.
BMP Violation12/1/201012/2/201012/2/2010APART
DetailsClint A Smith
BMP Violation11/30/201012/1/201012/1/2010PPART
DetailsClint A Smith
HAve begun o correct the violaion that were posted. Will re-inspect for full complaine on 12/2/10am.
BMP Violation11/30/201011/30/201011/30/2010PFAIL
DetailsClint A Smith
CORRECTION NOTICE:
1. Clean up all sediment and debris off of all hard surfaces.
2. Due to weather conditions doulbe protectthe storm drains with an external protection of a weighted wattle.
3. Update Responsible person info with the city.
4. Install a weighted sediment barrier behind both asphalt cuts to the disturbed soil.
Failure to comply wwill result in a stop work order. Will re-inspect on 12/1/2010PM.
Site Preparation11/3/201011/4/201011/4/2010APASS
DetailsJim Sly
Zach phone...............They have Conc wash out pit with sign......protection at stockpile dirt.
Site Preparation11/1/201011/2/201011/2/2010APART
DetailsJim Sly
Zach phone
Need Concrete washout pit and sign for it prior to pouring.....they said they would dig one.......Need to protect, contain or remove stockpiled dirt located on hard surfaces.
Site Preparation10/19/201010/19/201010/19/2010 PASS
DetailsClint A Smith