Site Final | 9/10/2010 | 9/10/2010 | 9/10/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/25/2010 | 8/25/2010 | 8/25/2010 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/18/2010 | 8/18/2010 | 8/18/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/13/2010 | 8/13/2010 | 8/13/2010 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/12/2010 | 8/12/2010 | 8/12/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/10/2010 | 8/10/2010 | 8/10/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/9/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/5/2010 | 8/5/2010 | 8/5/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 8/5/2010 | 8/5/2010 | 8/5/2010 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/4/2010 | 8/4/2010 | 8/4/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Must provide a washout for the project. RP will make sure that it will inplace prior to any washing of any non stormwater pollutants.
|
BMP Violation | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | PASS |
Mike Jordan
|
|
|
Washout has been established, di protection installed as well as sediment barriers for all on site stock material.
|
Site Preparation | 7/30/2010 | 7/30/2010 | 7/30/2010 | P | PART |
Jim Sly
|
|
|
Tony phone Need concrete washout pit or receptical prior to pouring concrete.
|
BMP Violation | 7/14/2010 | 7/16/2010 | 7/16/2010 | A | PART |
Clint A Smith
|
|
|
Must provide a washout prior to any non storm water pollutants can be washed out and contained.
|
BMP Violation | 7/14/2010 | 7/14/2010 | 7/14/2010 | P | CANC |
Clint A Smith
|
|
|
wrong date
|
BMP Violation | 7/14/2010 | 7/16/2010 | 7/14/2010 | A | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 7/14/2010 | 7/14/2010 | 7/14/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: 1. Provide a non storm water pollutant washout. 2. Provide a storm drain inlet protection at the storm drain at the west end of the project. 3. Post ESC sign at the front of the building. Will re-inspect on 7/16/10am.
|