Site Final | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/8/2011 | 3/8/2011 | 3/8/2011 | | PART |
Clint A Smith
|
|
|
Discussed with RP over the clean up of the areato the north of the building. Concrete washout must be removed and disposed of properly. After the lot is cleanedup then it must have final stabilization practice initiated. Will re-inspect once the next general inspection is created by the inspection report.
|
Random Inspection | 1/21/2011 | 1/21/2011 | 1/21/2011 | P | PASS |
Jim Storey
|
|
|
p$z bond for landscaping will remain esc until complet.
|
General Inspection | 1/20/2011 | 1/20/2011 | 1/20/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 12/27/2010 | 12/27/2010 | 12/27/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 12/22/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/3/2010 | 11/3/2010 | 11/3/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 11/2/2010 | 11/2/2010 | 11/3/2010 | P | PASS |
Jim Storey
|
|
|
|
BMP Violation | 10/28/2010 | 11/1/2010 | 11/1/2010 | A | PASS |
Clint A Smith
|
|
|
All issues have been corrected.
|
Random Inspection | 10/28/2010 | 10/28/2010 | 10/28/2010 | P | PART |
Steven Webb
|
|
|
Verbal to RP, trash pile on hard surface needs to be containerized in the on site dumpster, washout pit needs to be maintained, (full) and misc. material outside the pit. Sweep hard surfaces prior to rain which is forecasted over the weekend. Will follow up.
|
Random Inspection | 10/25/2010 | 10/25/2010 | 10/25/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/19/2010 | 10/19/2010 | 10/19/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/13/2010 | 10/13/2010 | 10/13/2010 | A | PASS |
Jim Storey
|
|
|
|
Site Preparation | 9/27/2010 | 9/27/2010 | 9/28/2010 | | NR |
Jim Storey
|
|
|
|