Site Final | 12/30/2011 | 12/30/2011 | 12/30/2011 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 12/30/2011 | 12/30/2011 | 12/30/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 12/12/2011 | 12/12/2011 | 12/12/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 11/10/2011 | 11/10/2011 | 11/18/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | | PASS |
Eric Strole
|
|
|
site looks good
|
General Inspection | 9/8/2011 | 9/8/2011 | 9/9/2011 | | CANC |
Eric Strole
|
|
|
|
General Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/5/2011 | 7/8/2011 | 7/8/2011 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/1/2011 | 7/5/2011 | 7/5/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide sediment barrier protection for the stockpile within the alleyway. Remove stockpile along the fenceline on Longmont where it is spilling onto the sidewalk. Will follow up on 7/8/2011AM.
|
Site Preparation | 7/1/2011 | 7/1/2011 | 7/1/2011 | P | FAIL |
Clint A Smith
|
|
|
Message to RP: Left a message with RP to set up a meeting to go over the ESC plan on 7/5/2011. Waiting on a call , but will return on 7/5/2011 for further enforcement.
|
General Inspection | 6/6/2011 | 6/6/2011 | 6/7/2011 | | PART |
Clint A Smith
|
|
|
nO ACTIVITY
|
General Inspection | 5/5/2011 | 5/5/2011 | 5/6/2011 | | PASS |
Jim Storey
|
|
|
No activity
|
Random Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/7/2011 | 3/7/2011 | 3/7/2011 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | | DONE |
Clint A Smith
|
|
|
No activity. BLD will not expire till 7/2/2011.
|
General Inspection | 1/4/2011 | 1/4/2011 | 1/4/2011 | | NR |
Clint A Smith
|
|
|
No activity
|