Site Final | 4/16/2012 | 4/16/2012 | 4/16/2012 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/16/2012 | 4/16/2012 | 4/16/2012 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 4/5/2012 | 4/5/2012 | 4/5/2012 | | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 3/5/2012 | 3/5/2012 | 3/5/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/3/2012 | 2/3/2012 | 2/3/2012 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/3/2012 | 1/3/2012 | 1/4/2012 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 11/28/2011 | 11/28/2011 | 11/28/2011 | | PASS |
Daryl Spivey
|
|
|
site clean
|
General Inspection | 10/27/2011 | 10/27/2011 | 10/28/2011 | | CANC |
Eric Strole
|
|
|
|
General Inspection | 9/26/2011 | 9/26/2011 | 9/26/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 8/25/2011 | 8/25/2011 | 8/26/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 7/25/2011 | 7/25/2011 | 7/25/2011 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 6/23/2011 | 6/23/2011 | 6/23/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 5/23/2011 | 5/23/2011 | 5/23/2011 | | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 4/22/2011 | 4/22/2011 | 4/22/2011 | P | PASS |
Troy James
|
|
|
|
General Inspection | 4/5/2011 | 4/5/2011 | 4/7/2011 | | PART |
Dave Hannah
|
|
|
drove around site looks ok dident have site plan so I cant tell if lay out is per plan
|
General Inspection | 3/4/2011 | 3/4/2011 | 3/4/2011 | | PASS |
Clint A Smith
|
|
|
Site in good condition.
|
General Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/31/2010 | 12/31/2010 | 1/3/2011 | | CANC |
Steven Webb
|
|
|
HOLIDAY
|
Random Inspection | 9/13/2010 | 9/13/2010 | 9/13/2010 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 9/2/2010 | 9/3/2010 | 9/3/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 8/27/2010 | 9/1/2010 | 9/1/2010 | A | PART |
Clint A Smith
|
|
|
In the process of installing there sediment barrier correctly.
|
Random Inspection | 8/30/2010 | 8/30/2010 | 8/31/2010 | A | FAIL |
Dave Hannah
|
|
|
steve and clent are working on this I talked with home owner he will call his contractor and get steves c/n items done
|
Site Preparation | 8/27/2010 | 8/27/2010 | 8/27/2010 | | PART |
Steven Webb
|
|
|
Verbal to RP: Remove concrete material from ground surface and place in dumpster or wash out pit. Sediment barrier (straw wattle) around the pond and ditch not installed correctly, not staked or trenched in. Complete all corrections by the end of the day of Monday, Aug. 30. Re-inspection will occurr Tuesday or Wednesday. Also, questioned operator about area of disturbance and the possilbe need to secure coverage with EPA under the Construction General Permit.
|